Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2023

September 12, 2023

October 5, 2023

Under Construction

Bridges / Tunnels

$53,320.00

Public - City

Demolition, New Construction, Paving, Site Work

img_map_placeholder

102 Park Dr, Marysville, PA

Subscribe to View Full Documents

Demolition, site work, paving and new construction of a bridge / tunnel in Marysville, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and bridge / tunnel.

Work shall consist of disassembly of existing handrail sections, removal of existing bridge from stream channel, transfer to a climate controlled facility, preparing surface of the bridge to be primed and painted, and reinstalling the bridge including grate replacement and lead abatement testing certification.All of the equipment, materials and labor that may be necessary to complete the Work and place it in satisfactory operation, implied or intended in the Plans and Specifications, shall be furnished and/or installed without extra cost to the OWNER. The Owner reserves the right to reject any or all Bids and to waive any irregularity in Bids received whenever such rejection or waiver is in its interest. Wages of forepersons; equipment operators; and skilled, semi-skilled, and common laborers directly assigned to the specific operation will be reimbursed as direct labor at contract or actual payroll rate of wages per hour and actual fringe benefits paid, for each hour that such employees are actually engaged in the performance of the authorized Work and, if directed, overtime as provided by existing laws and regulations. Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the OWNER, unless otherwise specified. Question Deadline 7/26/2023 6:00 PM Removal and rehabilitation of an existing 42' bridge at the Northern end of the Marysville Lions Club Park near Cassell St. a. Construction Staging - Must be approved by Borough. b. Remove all connections to existing bridge abutments necessary to fully remove all bridge components. c. Disassemble the handrail at the abutments and all other bridge components. d. Load bridge via crane onto flatbed trailer to transport to a climate-controlled facility. e. Prepare surfaces to receive new coatings of primer and paint. f. Apply primer and finish coat of approved paint in a shop-controlled environment. g. Provide lead abatement testing certification prior to reinstallation. h. Replace refinished superstructure and secure to abutments. i. Install new grates and secure to superstructure. j. Reinstall refinished handrail system and ensure all other existing abutment and superstructure connections are painted to match refinished bridge components. 9. Community Block Development Grant a. Project Goals i. MBE: 5% ii. WBE: 3% iii. Section 3: 25% iv. Targeted Section 3: 5% 1. Bridge Rehabilitation a. Contractor shall remove all connections to existing bridge abutments necessary to fully remove all bridge components. b. Contractor shall remove bridge by dissembling the handrail and all other bridge components necessary to complete rehabilitation and load bridge via crane onto flatbed trailer to transport to a climate-controlled facility. c. Contractor shall surface blast bridge components to remove existing lead paint and prepare surfaces to receive new coatings of primer and paint. d. Contractor shall apply an approved primer and finish coat of epoxy-based paint system in a shop-controlled environment. e. Contractor shall provide lead abatement testing certification prior to reinstallation. 2 f. Contractor shall replace refinished superstructure and secure to abutments. g. Contractor shall install new grates and secure to superstructure. h. Contractor shall reinstall refinished handrail system and ensure all other existing abutment and superstructure connections are painted to match refinished bridge components.

69 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
333
Active Projects
192
Bidding Soon

Related Projects


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.