BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Sunnyvale, California. Conceptual plans call for the renovation of a water / sewer project.

The Water Pollution Control Plant (WPCP) gas utilization system is designed to allow for optimum use of gas produced in the anaerobic digesters and of the gas recovered from the former Sunnyvale landfill. The gases are beneficially used in the main engines (plant influent pumps) and the Power Generation Facility (PGF). Natural gas is used as a supplemental fuel when necessary. The gas utilization system controls, meters and distributes the gases to the intended points of use. When necessary, excess digester gas can be directed to the waste gas burners and excess landfill gas can be directed to the landfill gas flare which consists of two flares. One of the landfill gas flares is automated which lights when pressure in the system exceeds the set point to relieve excess gas pressure. The other is manually operated. The waste gas burner system has had several revisions since it was first installed in 1952 including the installation of a newer flare in 1989. This project will include design and construction of upgrades necessary to support air permitting requirements and higher loads concurrent with Projects 833350 - SCWP Digester No. 5 and 833360 FOG/Food Waste Facility. This project is in included in the City of Sunnyvale FY 2022/23 Adopted Budget . As of September 22, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$3,396,134.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
73
Bidding Soon
1,520
All Active Projects
657
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

1444 Borregas Ave, Sunnyvale, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.