BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Seattle, Washington. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Seattle Public Schools (District) is requesting statements of qualifications and proposals from General Contractor/Construction Manager (GC/CM) firms to support the district's Capital Projects division to provide preconstruction and construction services for the John Muir ES Early Learning Addition and Miscellaneous Improvements project identified in the Buildings, Technology, and Academics/Athletics V (BTA V) Capital Levy. The district intends to award a contract utilizing the General Contractor/Construction Manager (GC/CM) competitive alternative construction procurement process authorized under the Revised Code of Washington, Chapter 39.10. The district obtained project approval from the Washington State CPAR.B PRC to utilize the GC/CM delivery method on this Project The proposed project is located at 3301 South Horton Street Seattle, WA 98144, on a 2.75- acre site. The project includes a four (4) classroom early learning addition with before and after school child care support spaces and the following miscellaneous improvements to the existing building: renovation of the open floor plan into three classrooms on the third floor of the 1971 classroom addition; replacement of the existing windows on second and third floors of the 1971 classroom addition with new thermopane windows; replacement of the fire alarm system; upgrades to the existing fire suppression system; replacement of the existing lighting with new LED lighting; replacement of the existing electrical service for the entire building, including expanding the main electrical room; replacement of the domestic water heater: modernization of the loading dock; and, site development to add modular playground equipment, bicycle parking, and right-of-way curb ramp work. The scope of work for this construction project will be performed while the campus site is occupied The project is funded through the BTA V Capital Levy and Distressed School Grant. The total estimated value of work to be contained within the GC/CM contract is approximately $9.6 million, including GC/CM contingency and excluding Washington State Sales Tax The GC/CM for the Project will provide Preconstruction Services, bringing expertise and experience that will assist in decision making, cost estimating, constructability review, budget and schedule control, sequencing of the project components. The district intends that the GC/CM will provide Preconstruction Services and serve as General Contractor, providing construction services and construction management to implement and deliver the Project

Bid Results

Educational

$3,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
48
Bidding Soon
894
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.