BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Demolition, site work and paving for a civil project in New Tecumseth, Ontario. Design plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Rehabilitate or replace the Boyne River Bridge on County Road 10, approximately 75m north of Highway 89, in the Township of New Tecumseth. The existing bridge is a 3-span reinforced concrete slab on precast concrete girders which measures approximately 21.2m in each of the span for a total span length of 63.6m. TIMELINE: Designs are ongoing. Tender will be issued pending owner's decision to proceed. Construction is anticipated in 2027; timeline has not been released. Further update summer/fall 2026.

Design

Bridges / Tunnels

$4,825,000.00

Public - County

Demolition, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
670
Active Projects
360
Bidding Soon
3,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2027

Project location map

County Rd 10, New Tecumseth, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.