Site work for a water / sewer project in Bullhead City, Arizona. Completed plans call for site work for a water / sewer project.

The City of Bullhead City, Arizona is extending an Invitation for Bid for the installation of Armorock epoxy resin manhole inserts, and the removal and replacement of the concrete collars, frames, covers, and manhole riser rings on 39 existing sanitary sewer manholes and other work as necessary for the completion of the project in accordance with the Project Specifications. Bypass pumping (or other approved method) will be required at all manholes to repair and coat all manhole benches and channels within this project. The manholes are in various locations throughout the City. The City of Bullhead City Utilities Department will provide the Armorock manhole inserts, Ram-Nek mastic sealant, epoxy coating for the bench and channel, Pro-Ring (EPP) Grade Rings, EJ COM 3200 composite frames and lids. The contractor will be responsible for providing M1 Adhesive/Sealant as recommended by Cretex to adhere the grade rings, concrete, cement slurry, grout, or any other materials not provided by the City at no additional cost to the City. The City inspector may elect to salvage manhole lids and/or frames at inspector's discretion. The contractor will be responsible for proper disposal of all other removed materials including but not limited to cast iron frames and lids, concrete collars, concrete cones, asphalt and debris cleaned from each manhole at no additional cost to the City. Project must be complete within 120 days of the Notice to Proceed. Brief procedural questions concerning this IFB can be directed to Crystal Wilson, Administrative Analyst, 2355 Trane Road, Bullhead City, Arizona 86442 (928) 763-9400 ext. 8840, FAX (928) 763-0131 or by email at crwilson@bullheadcityaz.gov. Technical questions regarding this IFB can be directed to Ryan Farnell, Utilities Construction Manager, by email at rfarnell@bullheadcityaz.gov and received no later than 12:00 PM Arizona time on January 13, 2023. Questions may then be responded to by written amendment to this document. Oral statements or instructions do not constitute an amendment to the IFB.

Award

Water / Sewer

$935,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
13
Bidding Soon
364
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

February 27, 2023

img_map_placeholder

Multiple Locations, Bullhead City, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.