BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Fresno, California. Conceptual plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The City of Fresno (CITY) Public Works Department is requesting Statements of Qualifications(SOQ) from qualified Civil Engineering firms to provide Manchester Park Splash Pad Design Services for the City of Fresno Public Works Department Capital Program (BID FILE NO.12301351). Services will include but are not limited to providing professional engineering design services resulting in contract documents (plans, specifications, and cost estimates) for Manchester Park Splash Pad, which includes in general: replacement of the existing wader pool within the park with a new splash pad infrastructure. The project scope shall include, but is not limited to, new interactive features, multiple jets/sprays, Americans with Disabilities (ADA) compliant accessibility, UV sanitized recirculating water system, CMU enclosures of plumbing and infrastructure, shower, waste receptacles, shade structure and landscape improvements. In general: The consultant team must have the expertise, experience, and demonstrated resources available to perform the work described in this RFQ. Not all the items may be needed for every project. The Consultant's services shall include, but are not limited to, the following: Participate in coordination meetings with City Staff Community Engagement and participation in Community Meetings Conduct site investigation in order to prepare construction documents Provide Geotechnical testing as required Prepare and maintain design and construction schedule Prepare all required CEQA documentation. The City will provide formal notification, pursuant to AB 52, to designated contact or tribal representative of traditionally and culturally affiliated California Native American tribes for tribal consultation, prepare a Notice of Intent to adopt, perform all required CEQA postings and noticing and prepare the notice of Determination. Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement Submitting construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents As part of the construction phase and general construction contract administration, attend the pre-construction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order request if necessary, and perform as many as two site visits during construction. Services will include preparation of necessary plans, specifications, estimates, necessary utility relocations and utility coordination and environmental document preparation. In general: Participate in coordination meetings with City Staff Community Engagement and participation in Community Meetings Conduct site investigation in order to prepare construction documents Provide Geotechnical testing as required Prepare and maintain design and construction schedule Prepare all required CEQA documentation. The City will provide formal notification, pursuant to AB 52, to designated contact or tribal representative of traditionally and culturally affiliated California Native American tribes for tribal consultation, prepare a Notice of Intent to adopt, perform all required CEQA postings and noticing and prepare the notice of Determination. Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement Submitting construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents As part of the construction phase and general construction contract administration, attend the pre-construction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order request if necessary, and perform as many as two site visits during construction. Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A No Should you have any questions or require additional information, please contact Armando Cervantes in writing by email at Armando.cervantes@fresno.gov. Phone calls will NOT be accepted. The method of contractor selection has not been determined at this time.

Conceptual

Swimming Pools

$180,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
53
Bidding Soon
740
All Active Projects
318
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2023

January 31, 2024

img_map_placeholder

3414 N Fresno St, Fresno, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.