Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of March 25, 2024 project was awarded to Manatt's, Inc., awarded amount is $295,089.02. The SW Magazine Road & SW State Street Intersection Improvements - West Leg project includes widening SW Magazine Road to add a second eastbound through lane, beginning approximately 575 feet west of SW State Street in the City of Ankeny. The construction improvements include approximately 230 SY of 9" thick PCC Class C-SUD street pavement, 1,130 SY of 8" thick PCC Class C-SUD street pavement, and the relocation of the existing traffic signal pole and mast arm at the southeast corner of SW Magazine Road & SW State Street. Other associated improvements include Class 10 excavation, subgrade preparation, granular subbase, paved medians, driveways, sidewalks, pedestrian ramp improvements, relocation of pedestrian push buttons, pavement markings, temporary and permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within forty (40) working days. Substantial completion for the overall project shall be defined as all utility, grading, pavement, and traffic signal construction completed; with all pavement markings and signs installed, all streets, driveways, and sidewalks fully open to traffic, and the traffic signal fully operational. A mandatory six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days commencing on a mutually agreed upon date following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). Performance, Payment, and Maintenance Bond Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Ankeny and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Ankeny from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of four (4) years from and after acceptance of the
Award
Roads / Highways
$295,089.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2024
May 28, 2024
SW Magazine Dr & SW State St, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Mar 26 2024
Ankeny, IA
Bid Date: Sep 20 2022
Ankeny, IA
Bid Date: Jan 31 2023
Ankeny, IA
Bid Date: Jan 31 2023
Ankeny, IA
Bid Date: Jan 31 2023
Ankeny, IA
Bid Date: Jan 31 2023
Ankeny, IA
Bid Date: Apr 09 2024
Ankeny, IA
Bid Date: Jan 10 2023
Ankeny, IA
Bid Date: Mar 14 2023
Ankeny, IA
Bid Date: Jul 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.