BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of March 25, 2024 project was awarded to Manatt's, Inc., awarded amount is $295,089.02. The SW Magazine Road & SW State Street Intersection Improvements - West Leg project includes widening SW Magazine Road to add a second eastbound through lane, beginning approximately 575 feet west of SW State Street in the City of Ankeny. The construction improvements include approximately 230 SY of 9" thick PCC Class C-SUD street pavement, 1,130 SY of 8" thick PCC Class C-SUD street pavement, and the relocation of the existing traffic signal pole and mast arm at the southeast corner of SW Magazine Road & SW State Street. Other associated improvements include Class 10 excavation, subgrade preparation, granular subbase, paved medians, driveways, sidewalks, pedestrian ramp improvements, relocation of pedestrian push buttons, pavement markings, temporary and permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within forty (40) working days. Substantial completion for the overall project shall be defined as all utility, grading, pavement, and traffic signal construction completed; with all pavement markings and signs installed, all streets, driveways, and sidewalks fully open to traffic, and the traffic signal fully operational. A mandatory six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days commencing on a mutually agreed upon date following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). Performance, Payment, and Maintenance Bond Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Ankeny and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Ankeny from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of four (4) years from and after acceptance of the

Award

Roads / Highways

$295,089.00

Public - City

Paving, Site Work

32

5

8

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
35
Bidding Soon
572
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

May 28, 2024

img_map_placeholder

SW Magazine Dr & SW State St, Ankeny, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.