BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2023 at 7:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Description: The 2023 PCC Pavement Preservation Program project includes the following: o Site 1: Cleaning and filling of cracks and joints in the Meadowlark Plateau, Golfview Terrace, North Creek, and Westwood Ankeny Neighborhoods. o Site 2: Full depth PCC patching on NW North Creek Drive and NW Cedarwood Drive. o Site 3: PCC paving on SW Meadowlark Lane. The construction improvements include the cleaning and filling of approximately 32,000 LF of longitudinal joints, 34,000 LF of transverse joints, and 6,000 LF of miscellaneous cracks, 450 SY of 7" thick PCC Class C-SUD pavement for full depth patching, and 850 SY of 7" thick PCC Class C-SUD street pavement. Other associated improvements include temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. Additional Description: The Contactor shall fully complete the improvements for Site 1 and Site 2 no later than October 31, 2023. Fully complete shall be defined as all work completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The Contactor shall fully complete the improvements for Site 3 in twenty-five (25) working days. Fully complete shall be defined as all work completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). Document Information: This fee is refundable, provided the following conditions are met: (1) The Contract Documents are returned complete and in a good usable condition. (2) They are returned within fourteen (14) calendar days after the award of the project. Proposals will be considered by the City of Ankeny City Council at its meeting at 5:30 P.M. on the 6 th day of February, 2023 City of Ankeny City Council meetings are open for the public to attend in person. City Council meetings are also conducted virtually and interested persons may attend the meeting virtually by the following methods: 1. Join Meeting Electronically: https://zoom.us/j/97312992966pwd=OEFocWZGS0NYUmtnVHNxcWZFak9Pdz09 Meeting ID: 973 1299 2966 Passcode: 1234 2. Join Meeting by Phone: Dial: +1 312 626 6799 Meeting ID: 973 1299 2966 Passcode: 1234

Bid Results

Roads / Highways

$429,015.00

Public - City

Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
103
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

April 3, 2023

Project location map

Multiple Locations, Ankeny, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.