BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a civil project in Neshkoro, Wisconsin. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of 02/08/2023 All bids were rejected. Est. Completion Date: Feb. 2, 2024 All bids rejected Description: The work for this project will be performed at the site of the existing Village of Neshkoro Main Sewage Lift Station. This Contract shall include all labor and equipment including general, mechanical, electrical, and instrumentation work. The Contractor shall be responsible for constructing, modifying, and maintaining in service the sewage system associated with the replacement of the Main Sewage Lift Station at all times unless specifically indicated otherwise. The Owner's operating personnel will be responsible for operating existing and new facilities in accordance with the construction sequence and schedule. At no time shall the Contractor's personnel, equipment, or material prevent the access by Owner's staff to any item of equipment, piping, wiring, or controls. The Contractor shall notify the Engineer one week in advance of the time that is necessary to take out of service an existing sewage lift station, piping, or electrical circuit, or to bypass any portion of the sewage lift stations, force mains, or sanitary sewers. Bypassing of untreated or partially treated wastewaters to surface waters, storm sewers, or drainage courses will not be permitted during construction. The Contractor shall forward flow to the WWTP located just southeast of the station. The existing Main Sewage Lift Station was constructed in 1973. The Main Sewage Lift Station is located approximately 350 feet north of the intersection of S State Street and E Wall Street, near a gravel lot on a Village owned parcel off of S State Street. Access to the site is from public right of way. Additional Description: Replace the Main Sewage Lift Station Pump Controls & SCADA Engine Generator & Transfer Switch

Award

Water / Sewer

$498,800.00

Public - City

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
44
Bidding Soon
761
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 22, 2023

img_map_placeholder

To Be Determined, Neshkoro, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.