BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2023 at 8:00 PM

Updated January 29, 2024

Renovation of a municipal facility in Tool, Texas. Completed plans call for the renovation of a municipal facility.

Lakeside Construction and Renovation was awarded the contract. The final bid amount was $125,015.00. The work was completed on Wednesday, March 16, 2023. THE CITY OF TOOL will accept sealed bids for a renovation at the Oran White Civic Center to renovate the flooring, roofing, and interior design at 701 N. Tool Drive, Tool, TX 75143. Direct inquires may be sent to Julius Kizzee, City Administrator at 903.432.3522 x 106 or at jkizzee@tooltexas.org. Bidder's attention is directed to requirements relating to HUD, Federal and State Labor Standards, and federal Affirmative Action/Equal Employment Opportunity requirements. Rights are reserved to reject any or all bids. The City of Tool, Texas will accept sealed bids for a construction contract to furnish all labor, materials and related costs for a renovation at the Oran White Civic Center, renovating the flooring, roofing and interior design at 701 N. Tool Dr., Tool, Texas, 75143. Inquiries regarding this Invitation to Bid should be directed to Julius Kizzee, at 903.432.3522 x 106 or at jkizzee@tooltexas.org. Bidder's attention is called to requirements relating to HUD, Federal and State Labor Standards, and federal Affirmative Action/Equal Employment Opportunity requirements. Rights are reserved to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project is to help the Oran White Civic Center receive a facelift - something that has not happened in decades. The Civic Center will need to go through renovations to make it more modern, technological and accessible for those that will be visiting our facilities in the coming years. The City would like to see the Civic Center become a place where the entire community can hold club meetings, City Council meetings and recreational activities. The goals of this project include: - Remove all paneling - Repair by taping and floating existing sheet rock under paneling or replace. - Paint the entire interior and exterior of building. Sand and paint kitchen cabinets. - Add new granite countertops - Add new hardware to cabinets - Install new vinyl wood plank for the entire civic center floor. - Install stone or brick, three feet high along front of Civic Center only and wainscot. - Add wood base board floor trim - Add new vanities and mirrors and hardware in both bathrooms and paint the bathrooms. - A city ordinance requires a dumpster on site to remove trash and debris on exterior around the building. - Replace all bad drop ceiling panels in Civic Center - approximately 40 12. Any additional cosmetic work to bring building up to standard of expectations.

Award

Municipal

$125,015.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
413
Active Projects
199
Bidding Soon
3,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2023

March 20, 2023

Project location map

701 N Tool Dr, Tool, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.