BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and new construction of a pre-engineered storage facility in Tool, Texas. Completed plans call for the construction of a 3,800-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Construction of a New Maintenance Barn The City of Tool, Texas will accept sealed bids to furnish all labor, materials and related costs for the construction of a new maintenance barn. Inquiries regarding this Invitation to Bid should be directed to LaCosta Davis, at 903.432.3522 x 108 or at ldavis@tooltexas.orq A Request for Proposals (RFP 2025-01) can be made available to bidders as requested, via email at contact@tooltexas.org or at Tool City Hall located at 701 N. Tool Dr., Tool, Texas, 75143. This bid may be awarded either to the lowest responsible bidder or to the bidder who provides goods or services on the basis of "best value" for the municipality. All bidders must provide proof of a payment and performance bond for the job. Bidder's attention is called to requirements relating to HUD, Federal and State Labor Standards, and federal Affirmative Action/Equal Employment Opportunity requirements. Rights are reserved to reject any or all bids. The work consists of a single story, metal building that is approximately +/- 3,800 square feet, with heights reaching approximately 19 feet. Included in the bid shall be all site work, concreting of the slab, foundations, construction of the metal structure. Divisions for the work shall be bid according to the plans specified for this project, which are attached to this RFP. Details include: February 13th - March 1at 11:59 p.m. March 11th, 2025 11:00 a.m. March 20, 2025 6:00 p.m, • Insulated walls, office and metai building • Driveway and apron construction, per plans • I-beams and Tongue and Groove flooring to create a storage space over the office area • OSB Board along the north side of the building and along the adjoining back wall • HVAC Mini split for office area • OSB board on shop side of office • R30 for ceiling, with spray foam insulation • CAT 6 or equal for office • Bidder must obtain a soil sample & must engineer the slab • TVEC service is available underground • Bidder must be able to obtain a Texas Department of Licensing and Registration (TDLR) Permit • Lighting per plans

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$402,500.00

Public - City

New Construction, Site Work

3

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
201
Bidding Soon
3,763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

Project location map

To Be Determined, Tool, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.