EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 9, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a road / highway in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work included in this Contract, WS-23-6, shall consist of the surface preparation and asphaltic seal coating on various existing asphalt streets within the City of Manitowoc. The location of each street is specified in the contract documents and they are also shown on the map at the end of these Special Provisions and Conditions. It is the intent of the City of Manitowoc to install a double sealcoat on some of the streets included in this contract. The Contractor shall use washed and fractured 3/8" granite stone chip (uncoated chips) for the base layer aggregate and a washed 1/8" granite stone chip aggregate for a finish/surface layer aggregate on the double layer seal coated streets. The Contractor shall use a washed 1/8" granite stone chip aggregate on streets receiving a single layer seal coat. All work shall be as specified in the plans and as provided by the Contract. The Contractor shall not be permitted to begin work until July 10th, in order to allow the City crews time to complete the preparation work on each street. A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty. Est. Completion Date: Aug. 25, 2023 Site Directions: VARIOUS LOCATIONS THROUGHOUT THE CITY

Bid Results

Roads / Highways

$146,224.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
43
Bidding Soon
638
All Active Projects
206
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2023

March 10, 2023

img_map_placeholder

Multiple Locations, Manitowoc, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.