BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2024 at 7:00 PM

Updated May 10, 2025

Site work and paving for a mixed-use development in Cathlamet, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The purpose of this Amendment is to revise the Specifications section 40 05 13.00 para 2.3.1.1.(b.). b. The pressurized pipe must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of 0.95 inch. The gravity outfall pipes must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of .750 inch. Gravity outfall pipes can be the same thickness as the pressure pipe, but this is not required. Pipes are not required to be coated but coating does not need to be removed if products come coated. This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000. The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 - 6 weeks beginning May of 2024 (depending on award date). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$2,004,825.00

Public - Federal

Paving, Site Work

37

23

40

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
88
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

Project location map

184 E Sunny Sands Rd, Cathlamet, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.