Site work and paving for a mixed-use development in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Work included in this Contract shall be in accordance with the plans, City of Manitowoc Standard Specifications for Public Works Construction, current edition, Standard Specifications for Sewer and Water Construction in Wisconsin, current edition, the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, current edition, Manitowoc Public Utilities Specifications for Watermain Construction (Appendix E), the provisions of instructions to Bidders and the following Special Provisions, and to the satisfaction of the Engineer. This Contract consists of the new construction of "River Point Phase 2" which includes the area south of River Point Drive, and an extension of River Point Drive and Buffalo. The construction work includes furnishing and installing sanitary sewers, storm sewers, watermain, building services (laterals), furnishing and installing fill or borrow material, grading, graveling, doweled concrete pavement with integral curb, a concrete driveway, concrete curbs, concrete sidewalks, pavement markings, a GreenBlue Stormwater System, asphalt trails, retaining walls, stairs, electrical, streetscape, waterfront improvements, a dock with pilings, dry-stacked stone block features, landscaping, lawn seeding, railings, floating islands, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Add alternates have been identified for additional dockage, floating islands, electrical work, and all other incidentals required to complete the work. Items included in the add alternate have been called out accordingly on the plans. The Contractor shall furnish all of the necessary labor, materials, equipment, and supplies for completing all work included in this contract. A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

8

11

63

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Temporary Facilities and Controls, Construction Aids, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Tubs and Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Timber Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
28
Bidding Soon
699
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

April 7, 2023

img_map_placeholder

To Be Determined, Manitowoc, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.