Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a stadium in Laramie, Wyoming. Completed plans call for site work for a stadium.
Replacement of entire synthetic turf playing surface at War Memorial Stadium - Jonah Field, including regrading of existing aggregate base to manufacturer tolerances, markings and graphics similar to the existing field, that are in compliance with current NCAA regulations. Question Deadline 02/24/2023 at 4:30 PM MT Last day to submit Questions/Substitution Requests A. Removal and disposal of the existing synthetic turf. B. Regrade existing aggregate base to turf manufacturer tolerances. There are two (2) known minor depressions at the south edge of the existing surface, outside the playing field, in need of repair. C. Installation of new in-filled grass synthetic turf upon existing bases (-82,000 s.fi). 1. Field markings for Football, per current NCAA Rules. 2. Outlined Football numbers, mid-field and conference logos, and endzone, midfield, and sideline graphics, similar to the existing field. Final design must be approved by Owner before fabrication. D. Remove and reinstall goalpost, if required. E. (1) G-max test at completion. F. Final cleaning/ grooming. G. Close-out documentation including as-built drawings and specifications, submittals, and O&M manual. H. 10-year warranty for new synthetic turfsurface. I. Add-Alternates: 1. Expand Coaching Box and Team Area to 20-yard line, in both directions, on both east and west sides. a. Sawcut and remove existing concrete and base in four (4) locations (-240 s.f. total). b. Provide and install permeable aggregate base/ sub-base, and in-filled grass synthetic turf, to manufacturer's specifications. Remove and relocate existing turffabric attachment nailer, or provide new, as required. 2. Investigation of the existing base/ sub-base. To be completed as soon as field availability and weather conditions allow. a. Open existing turfto access existing condition in four to six (4-6) locations for investigation. b. Pothole by hand down to top of existing drainage pipe in minimum of two (2) locations. Backfill upon completion. c. Onsite permeability testing of exposed aggregate. d. Sampling of aggregate for laboratory gradation testing. e. Seam existing turf back immediately upon completion. f. Provide report of investigative findings. 3. Investigation of existing field drain system by camera -- assume 800-1200 l.f. On-site work will be able to commence after the football Spring Game, April 30, 2023. The tentative Substantial Completion date is July 1, 2023.
Post-Bid
Arenas / Stadiums
$300,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2023
April 7, 2023
1199 E Ivinson Ave, Laramie, WY
Related To This Project
Laramie, WY
Bid Date: Mar 15 2023
Laramie, WY
Bid Date: Jun 28 2023
Laramie, WY
Bid Date: Mar 28 2023
Laramie, WY
Bid Date: Apr 04 2023
Laramie, WY
Bid Date: Mar 28 2023
Laramie, WY
Bid Date: Apr 11 2023
Laramie, WY
Bid Date: Mar 20 2023
Laramie, WY
Bid Date: Jun 18 2024
Laramie, WY
--
Laramie, WY
Bid Date: Mar 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.