BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 20, 2023 at 8:00 PM

Updated February 18, 2025

Site work and paving for a sidewalk / parking lot in Morganton, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project involves the installation of a new sidewalk with curb and gutter, handicap ramps, etc.. The project will require grading and filling slopes to achieve the correct grades per plans, backfilling fill of the sidewalk once installed, grass seeding, and straw matting of disturbed areas, restoring of property owner's driveway, concrete walk, and wooden ramp at the point connection to the City sidewalk. Please review the plans and bid proposal, which provide all of the specific details and information on the project. A vicinity map is provided for your convenience and reference. All bids must be accompanied by one of the forms of bid security listed in the bid Summation, references of previous similar projects, and the applicable Affidavit A or B of the Disadvantaged Business Enterprise (DBE / MBE / WBE) forms included in the bid packet. Failure to include these items with the bid proposal may be deemed as non-responsive. No bids shall be received after the above-stated time. Bids will be open at City Hall in Council Chambers at the date and time stated above. Federal Funding has been secured to finance this project. Consequently, the wage rates included in the bid packet in the Bid Proposal section must be met by the Contractor for this project. Additionally, Davis-Bacon requirements shall be enforced for this project and interviews shall be conducted by the administering agency, namely WPCOG - Western Piedmont Council of Governments. Three originals of the bid documents shall be delivered to the City by the awarded Contractor for inclusion in and execution of the Contract Documents. If you plan to bid and did not receive your plans directly from the City of Morganton, please be sure that you are on our bidders list. Otherwise, you may fail to get updates or addenda. The bid listed on the Proposal Sheet shall remain valid for a period of up to 90 days after the bid submittal deadline listed until Notice to Proceed can be given. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $60,000.00 To $65,000.00

Award

Sidewalks / Parking Lot

$87,087.00

Public - City

Paving, Site Work

11

8

2

2

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
143
Bidding Soon
1,759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

April 24, 2023

Project location map

Caldwell St, Morganton, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.