Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2023 at 8:00 PM
Updated November 16, 2023
Renovation of an educational facility in Shirland, Illinois. Completed plans call for the renovation of a educational facility.
Roofing Replacement Work at Shirland School for Shirland CCSD #134 ARCHITECT: Richard L. Johnson Associates, Inc., 4703 Charles Street, Rockford, Illinois 61108, (815) 398-1231, (815) 398-1280 FAX SCOPE: Bids shall be submitted for all Reroofing Work. Bidding Documents may be secured from the office of the Architect.Plans and Specifications are available for download at online under "Contractors". PERFORMANCE BOND: A performance and payment bond for the full amount of the Contract will be required of the successful bidder. All costs associated with the bond shall be included in the bid amount. BID SECURITY: Bids shall be accompanied by a Bid Security of at least 5% of the total amount of the base bid and all additive alternate bids. This may be in the form of a certified check, cashier's check, bank draft, or bid bond, payable to the Owner as a guarantee that the bidder will enter into a contract with the Owner and will furnish the proper performance and payment bond within the time limited by the Owner. If the successful bidder so files the contract and performance and payment bond, upon the execution of the contract by the Owner, the Bid Security will be returned to all bidders. If he/she fails to file such contract and performance and payment bond the amount of the Bid Security will be forfeited to the Owner as liquidated damages. WAGE RULES: The general prevailing rate of wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract will adhere to all Federal Laws and Laws of the State, and to all local ordinances and regulations applicable to the work hereunder, and having force of law. RIGHTS RESERVED BY OWN- ER: The Owner reserves the right to waive any irregularities and/or reject any or all bids when, in the opinion of the Owner, such action will serve the best interests of the Owner. WITHDRAWAL OF BIDS: No bid may be withdrawn for a period of sixty (60) days after the opening of bids without written consent of the Owner.
Post-Bid
Educational
$300,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2023
April 10, 2023
8020 North St, Shirland, IL
Related To This Project
Shirland, IL
--
Urbana, IL
Bid Date: Apr 04 2023
Chicago, IL
Bid Date: Mar 15 2023
Quincy, IL
Bid Date: Mar 29 2023
Bradley, IL
Bid Date: Mar 08 2023
Trenton, IL
Bid Date: Mar 14 2023
Glencoe, IL
Bid Date: Mar 03 2023
Carbondale, IL
Bid Date: Mar 08 2023
Palestine Township, IL
--
Glen Ellyn, IL
Bid Date: Mar 01 2023
Itasca, IL
Bid Date: Feb 21 2023
Carlinville, IL
Bid Date: Mar 17 2023
Dekalb, IL
Bid Date: Mar 09 2023
Dekalb, IL
Bid Date: Mar 09 2023
Grant Park, IL
Bid Date: Feb 27 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
