BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Northborough, Massachusetts. Completed plans call for the renovation of a stadium; for site work for a stadium; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

https://www.communityadvocate.com/2023/04/20/i-support-rehabilitation-of-the-existing-athletic-complex-at-arhs-without-artificial-turf/ - The proposed installation of two artificial turf fields at the Algonquin Regional High School (ARHS) is not in the best interest of the community as described below: Injury rates. A May 2022 systematic review of 53 published articles published American Journal of Sports Medicine indicates that lower extremity injury rates are higher with artificial turf than with natural grass. This study is far from alone in determining that artificial turf results in higher rates injury rates. Cost of the artificial turf. Any truly independent analysis (not by the turf industry consultants) indicates that long-term costs of installation and future replacements for artificial turf significantly outweighs grass field costs. Climate change. The installation of artificial fields will have a large carbon footprint due to the replacement of carbon absorbing grass with artificial surfaces; the manufacturing, transportation and installation; and the need to continually replace artificial turf. Artificial turf fields also create heat islands negatively impacting players in warm weather. Artificial turf will eventually degrade and microplastics, and possibly other chemicals will be released to the surrounding environment. Player satisfaction. The NFL players union advocates for natural grass over artificial turf. After advocating for games on natural grass, the U.S. Women's National Soccer Team won the right to play future games on grass. For the 2026 World Cup, FIFA will not allow play on artificial turf. If artificial turf is unacceptable to the NFL Players Union and the US National Women's Soccer Team then artificial turf is unacceptable for Northboro and Southboro athletes. The detection of PFAS in soil at ARHS may increase costs associated with management of soils associated with the proposed installation. I support rehabilitation of the existing athletic complex at ARHS without artificial turf. _________________________________________________________________- Renovations to HS Stadium field including synthetic turf field, track reno, athletic lighting and grandstands, along w/syn. turf multifield with athletic lighting, tennis court reno, amphitheater/associated walkways. Question Deadline 03/07/2023 All questions must be submitted in writing to the following at least 72 business hours before the bid opening: Ms. Kathleen D. Hervol Copy: Mr. Matt Kinlin Title: Project Manager Senior Designer Email: kdh@gainc.com Email: msk@gainc.com Gale Associates, Inc. Gale Associates, Inc.

Bid Results

Arenas / Stadiums

$7,300,000.00

Public - County

Paving, Renovation, Site Work

53

20

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
639
Active Projects
376
Bidding Soon
5,166
All Active Projects
2,176
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 10, 2023

May 15, 2023

October 1, 2023

img_map_placeholder

79 Bartlett St, Northborough, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.