BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Springfield, Massachusetts. Conceptual plans call for the renovation of a educational facility.

For Phase 2 Design for Bathroom Locker Room Designer Fee Negotiated 100000 Phase 2 Design for Bathroom/Locker room renovations at school campus. Includes, but not limited to design, necessary engineering, bid documents, and oversight. Specified Services(all chosen) Architect; Engineer The method of contractor selection has not been determined at this time

Conceptual

Educational

$1,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
727
Active Projects
334
Bidding Soon
5,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

Project location map

To Be Determined, Springfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.