BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2023 at 8:00 PM

Updated November 7, 2025

Site work and paving for a road / highway in Potomac, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Montana Department of Transportation (MDT) is requesting bids for Overlay Chip/Fog Seal ADA Upgrades Milltown E Missoula Area. Questions or information relating to either specifications or requirements of this solicitation must be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. Contractor will provide all labor, equipment, materials, incidentals, and traffic control to remove and replace concrete curb and gutter, curb inlet frames and grates prior to commencing work on the Mill and Fill and Overlay portion of the project. Construct new ADA compliant sidewalk, curb and gutter and inlet structures according to the MDT provided plans and MDT Standard Specifications. Contractor will provide all labor, equipment, materials, incidentals, and traffic control to cold mill approximately 180,400 square yards of roadway at a depth of .15" as directed by MDT's project manager. The Contractor is responsible for hauling and disposal of the generated cold millings. Contractor is responsible for adjusting 5 manhole structures as directed by the MDT project manager following cold milling operations and prior to the Overlay portion of the contract. Contractor will provide all labor, equipment, materials, incidentals, and traffic control necessary to produce, haul, place, tack and compact approximately 17,900 tons of 1/2" Commercial Plant Mix Grade S PG 64-28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 41 feet wide. Contractor is responsible for identifying centerline prior to paving and must use an identifiable method to maintain consistent centerline control (i.e., Stringline or Paint) with approval from MDT's project manager when paving. Before commencing with the Chip Seal, the Contractor shall provide all labor, equipment, materials, incidentals, and traffic control necessary to install approximately 19 (nineteen) miles of Sinusoidal rumble strips on the centerline and shoulder of the roadway following completion of the Overlay as directed by the MDT project manager. Contractor to determine the centerline and place reflective tabs prior to the chip seal. The chip seal will be approximately 7.5 miles long and 41 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion & Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at .41 gallons per square yard. The cover material application rate is estimated at 23 pounds per square yard.

Award

Roads / Highways

$3,053,460.00

Public - State/Provincial

Paving, Site Work

22

5

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
4
Bidding Soon
85
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 1, 2023

Project location map

To Be Determined, Potomac, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.