Published April 19, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a municipal facility in Silverton, Oregon. Working plans call for the renovation of a municipal facility.

As of April 19, 2023, this project were cancelled. No definite date for the rebid. The City of Silverton is looking for a Contractor to perform tenant improvements to an existing modular structure located at 832 McClaine Street, next to Silverton City shops at 830 McClaine. Project includes new interior walls for two (2) offices, two new (2) bathrooms, one (1) storage room with janitors supply closet, entry room, and kitchenette inside the modular structure. Improvements also include painting, new flooring, cabinets, countertops, and kitchen appliances. Contractor will construct ramp entrance and deck to modular doors. Contractor will install electrical system serving the modular and 4 future pallet shelters, and a fire sprinkler system inside the modular with alarms and cabinets in accordance with provided plans and specifications. Contractor is responsible for completing design of fire sprinkler system that will be reviewed and approved by the City before construction begins. The fire sprinkler design shall have a 2 inch fire line serving the sprinkler riser and will also include identifying the location of the FDC. Contractor will be responsible for installing FDC, riser, and sprinkler system. Installation of 230'of 6' chain link fencing with brown slats and 20' electrical gate with remote control system. Work includes utility excavation and utility boring of communication lines and power. Firms must be added to the planholder list to obtain documents. The City may reject any proposal not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all proposals upon a finding of the City if it is in the public interest to do so. All questions related to the project must be directed to the Project Manager no later than March 14, 2023 at 2:00 p.m. Questions must be submitted via e-mail to BStepp@silverton.or.us.

Final Planning

Municipal

$479,355.00

Public - City

Renovation

11

22

4

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Heavy Timber Construction, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Structured Cabling, Communications Horizontal Cabling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
43
Bidding Soon
838
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

October 19, 2023

img_map_placeholder

832 McClaine St, Silverton, OR