BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Allenwood, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Municipal Building for the following contract: FULL DEPTH RECLAMATION OF BOB DRICK ROAD AND MILL ROAD Reclamation of Bob Drick Road will be 4,550 ln. ft. X 20 ft. wide and 6 depth with the use of Calcium Chloride Flake at the rate of 1.8 lbs. pr. Sq. yd. Upper portion (approximately 2,500 lin. ft.) of Bob Drick Road will have 1,800 ton of 2A paver placed as a final driving surface. Mill Road will be 2,500 lin. ft. X 18 ft. wide X 6 with the use of Calcium Chloride Flake at the rate of 1.8 lbs. pr. Sq. yd. At the direction of the township supervisor upon inspection, after the initial pass, will require stone (2A or 2B) and agreed upon where to place the stone after initial inspection, the stone required will be placed at a per ton price. After the stone is placed the application of calcium chloride is applied and commence the mixing pass. There will be a 10% bid bond requirement and Washington Township at their discretion may require a 100% performance bond. Supervisors have the right to accept or reject any and all bids

Bid Results

Roads / Highways

$169,228.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
121
Bidding Soon
1,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

May 3, 2023

Project location map

Multiple Locations, Allenwood, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.