Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Salt Lake City, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Relocation of utility and addition of utilities to the station platforms Construction of station platforms including all the utilities and the canopies structures. This includes snow melts systems for center stations and all canopy roofs as well as the necessary accessories for the stations. An extension of the North Jordan Canal. Construction of an exclusive busway along 4700 South which includes conforming to the Geotech report for the soils in the median Construct post and panel walls throughout the project Traffic control during construction Upgrading signals to accommodate including adding a TSP system. Signing and striping ATMS, Lighting and communications with connections to the UTA hubs Installation of UTA provided overhead chargers. Storm drain installation Re-landscaping disturbed areas Improvements to the West Valley Station Improvements to the Murray Station including coordination with Murray City for work within the environmentally sensitive Smelter Site Overlay District (SSOD) Construct a new bus stop hub at Salt Lake Community College (SLCC). Removal of the old hub at SLCC Following all environmental, quality and safety requirements Constructing the project with the proper Buy America requirements Assisting UTA with Public Relations as needed to provide property owners and the public understanding of project schedule and impacts to their properties/accesses. Contractor shall pay its employees and also ensure its sub-tier contractors at every level pay their eligible employees the prevailing wage rate as established by the Utah State Labor Commission. Unless otherwise excused by the terms of the Contract Documents, Contractors failure to timely perform the Work in accordance with the completion milestones shall result in the assessment of liquidated damages (if, and to the extent, set forth in the Agreement) and (where no liquidated damages are provided under the Agreement or where the maximum liquidated damages available under the Agreement have been incurred) an event of default. Project Start Date Estimated February 15, 2024 A Performance Bond equal to 100% of the Contract price provided prior to formal contract execution; and A Payment Bond equal to 100% of the Contract price provided prior to formal contract execution. Construct the Mid-Valley BRT project in a timely, safe, and efficient manner. This project is anticipated to be completed and activated for revenue service in 2026. Question Deadline 10/17/2023 at 2:00 PM Questions and Requests for changes to the RFP must be submitted via the SciQuest Q&A page before the end of the Question-and-Answer period UTA reserves the right to make changes to the RFP, by issuing a written addendum to the RFP which will be posted to SciQuest Construct Bus Rapid Transit infrastructure including stations, roadway, electrical, and communication systems. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Post-Bid
Roads / Highways
$54,700,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2023
February 15, 2024
Multiple Locations, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
Bid Date: Oct 18 2023
Salt Lake City, UT
Bid Date: Oct 04 2023
Salt Lake City, UT
Bid Date: Oct 05 2023
Salt Lake City, UT
Bid Date: Nov 17 2023
Salt Lake City, UT
Bid Date: Oct 05 2023
Salt Lake City, UT
Bid Date: Oct 26 2023
Salt Lake City, UT
Bid Date: Mar 20 2024
Salt Lake City, UT
--
Salt Lake City, UT
--
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Oct 05 2023
Salt Lake City, UT
Bid Date: Mar 10 2020
Salt Lake City, UT
Bid Date: Sep 28 2023
Salt Lake City, UT
Bid Date: Oct 05 2023
Salt Lake City, UT
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.