Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Highgate Center, Vermont. Completed plans call for site work for a road / highway; road / highway; and for paving for a road / highway.

must be clearly marked PAVING BID and received by the HiThe Town of Highgate is currently accepting bids for Road Paving. Bids ghgate Town Administrator, PO Box 189, Highgate Center, VT 05459. St. Armand Rd. - from Gagne Road to Campagna Rd, approximately 5,700 feet. 1,000 feet starting at Gagne Road will need a 0.75 shim, and the total 5,700 feet will need a 1.5-inch overlay. All of the road is 22 feet wide. Durkee Rd- from Hanna Road Intersection to end of pavement, approximately 1,200 feet long by 22 feet wide. All a 0.75-inch shim and 1.5-inch overlay. Rainville Road- from Gore Road to the end of pavement, approximately, 3,500 feet long will all need just 1.5-inch overlay, no shim. The road is 22 feet wide for 1,800 feet from Gore Road and then the remaining 1,700 feet are 18 feet wide. Machia Rd- from the B-25 Bridge to #2221, approximately 1 mile long by 22 feet wide. 0.5-inch shim and 1.5-inch overlay (this road segment is pending grant approval).

Post-Bid

Roads / Highways

$630,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
187
Bidding Soon
2,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

Project location map

Multiple Locations, Highgate Center, VT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed