Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2023 at 8:00 PM
Updated January 26, 2024
Demolition, site work, paving and new construction of a playground / park / athletic field in Northfield, Minnesota. Completed plans call for the demolition of a 1,479-square-foot, one-story above grade playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.
Project consists of General Construction for the Babcock Park Warming House / Shelter, single story building with pavilion. Building portion is approximately 1100 square foot including CMU/GCMU walls, fiber cement cladding, and wood truss roof and wood decking structure. Attached pavilion portion has GCMU columns and wood deck with wood glu-gam beam / truss roof structure. Work includes demolition of the existing bathroom / concessions structure, related foundations, and utilities. Scope of Work includes related Architectural, Landscape, Civil, Structural, Mechanical, and Electrical elements. Site Work includes demolition of existing concrete / wood stepped seating, softball backstops, and fencing. Site Work includes new stepped seating, plaza, softball field backstops / fencing, covered dugouts, retention basin, paving, associated landscaping / civil Work, and associated site electrical Work. Work includes installation of pre-purchased sports lighting poles / assemblies / fixtures for softball field and adjacent outdoor hockey rink. Work of this project shall conform to the B3 State of Minnesota Sustainable Building Guidelines (v3.2), Small Buildings Method. Awarded Contractor shall be required to participate in the required tracking and reporting associated with the B3 Guidelines interpretations and Correction of Bidding Documents: Replies to questions and correction of Bidding Documents will be issued to Bidders, Plan Rooms, and the Owner's Website, in the form of Addenda, which will become part of the Contract Documents.
Award
Playgrounds / Parks / Athletic Fields
$2,391,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2023
June 12, 2023
700 MN-3, Northfield, MN
Related To This Project
Northfield, MN
Bid Date: May 09 2023
Northfield, MN
Bid Date: Aug 10 2023
Northfield, MN
Bid Date: Aug 10 2023
Northfield, MN
Bid Date: Aug 10 2023
Northfield, MN
Bid Date: Dec 16 2021
Northfield, MN
Bid Date: Oct 22 2020
Northfield, MN
Bid Date: Mar 31 2022
Northfield, MN
Bid Date: May 04 2023
Northfield, MN
Bid Date: May 04 2023
Northfield, MN
Bid Date: Feb 07 2023
Northfield, MN
Bid Date: Feb 24 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
