EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 5, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Northfield, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

NOTICE is hereby given that SEALED BIDS for the furnishing of all labor, materials, tools, equipment and services for the following City of Northfield Project, all in accordance with applicable Minnesota Statutes, Northfield City Code, and City approved project plans and specifications and the Bidding Documents: LOCATION: o Harrison Court (Mill and Overlay) o Johnson Court (Mill and Overlay) o Grant Drive (Mill and Overlay) o Grant Court (Mill and Overlay) o Hayes Drive from Filmore Street to Johnson Street (Mill and Overlay) o Carter Drive - Filmore Street to Northfield Middle School (Mill and Overlay) o Heritage Drive - Hidden Valley Apartments to Lincoln Street (Pavement Reclamation) o Hidden Valley Road - Jefferson Road to Heritage Drive (Pavement Reclamation) o Peterson Drive - Hidden Valley Road to Lincoln Street (Pavement Reclamation) o Lincoln Street- Heritage Drive to Peterson Drive (Pavement Reclamation) o Thomas Court (Pavement Reclamation) o Adams Street - Lincoln Street to Roosevelt Drive (Pavement Reclamation) o Taylor Court (Pavement Reclamation) o Adams Court (Pavement Reclamation) o Tyler Court (Pavement Reclamation) o Anderson Drive from TH 246 to Aspen Street (Mill and Overlay) o Sunny View Drive from Sunny View Lane to Sibley View Lane (Mill and Overlay) o Sunny View Lane from Sunny View Drive to Arbor Street (Mill and Overlay) o Arbor Street from TH 246 to Aspen Street (Mill and Overlay) o Aspen Street/Aspen Court South Dead End to Cul-de-sac (Mill and Overlay) o Nevada Street/Ninth Street (walking and biking improvements) o Maple Street (walking and biking improvements) o Maple Street (walking and biking improvements) o Roosevelt Drive (walking and biking improvements) o Heritage Drive/Lincoln Street/Adams Street (walking and biking improvements) o Peterson Drive (walking and biking improvements) o TH 246 - Anderson Drive to the Roundabout (walking and biking improvements) TYPE OF WORK: Civil Engineering Major Items: PAVEMENT MARKING REMOVAL 26,720 LF COMMON EXCAVATION 3,641 C Y AGGREGATE BASE CLASS 5 3,463 TON FULL DEPTH RECLAMATION 26,026 SY MILL BITUMINOUS SURFACE (2.0") 12,382 S Y TYPE SP 9.5 WEARING COURSE MIX (2;B) 877 TON TYPE SP 9.5 WEARING COURSE MIX (3;B) 5,356 TON TYPE SP 9.5 NON WEAR COURSE MIX (3,B) 2,577 TON 12' - 33" RC PIPE SEWER DES 3006 1210 LF REPLACE GATE VALVE BOLTS 48 EACH CONST DRAINAGE STRUCTURE 48 EACH 4" - 6" CONCRETE WALK 49,646 S F 3" BITUMINOUS WALK 16,965 S F 6" CONCRETE DRIVEWAY 1,576 SY SODDING TYPE MINERAL 9,523 SY 4" - 6" PAVEMENT STRIPING MULT COMP 33,645 LF CONCRETE CURB & GUTTER 9,454 L F DECIDUOUS TREES 2.5" CAL B&B 102 EACH together with numerous related items of work, all in accordance with Plans and Specifications. Bids will be publicly opened and read aloud at that time and place stated above. Bids received after that time will not be accepted. Bids must be sealed, identified on the envelope and accompanied by a Bidder's Bond or Certified Check in an amount equal to at least 5% of the total bid made payable to the City of Northfield City Clerk. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids without the consent of City of Northfield, Minnesota. The successful Bidder will be required to furnish and pay for a satisfactory performance and payment bonds in the full amount of the awarded bid. The City reserves the right to reject any or all bids and to waive any irregularities thereof.

Award

Roads / Highways

$4,847,582.00

Public - City

Paving, Site Work

159

22

57

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks, Slings, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
54
Bidding Soon
912
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

May 30, 2023

img_map_placeholder

Multiple Locations, Northfield, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.