BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Long Beach, California. Working plans call for the renovation of a medical facility.

Tibor Rubin VA Medical Center, Long Beach, CA SF330 Request - 36C77623R0107 Technical Questions with VA Response The SOW references: A/E must perform an investigation of the existing utilities and relocation of such utilities in the courtyard between buildings 160, 164, and 7. All abandoned utilities discovered shall be removed. Can the govt clarify if the expectation is to include GPR for example to investigate and identify existing utilities, or is it sufficient to review record drawings in combination with the surface survey to ID utilities for relocation/abandonment Answer: Record drawing review and a surface survey should be adequate for this project. If the A/E determines a GPR investigation is necessary, then it may be included. The SOW references: The A/E Team shall provide the necessary professional services to conduct a complete site utility survey as needed to identify all utilities in the vicinity of and required for the subject project. Can we confirm if the VA is the Authority having Jurisdiction or will this require coordination with local utility providers Answer: Considering the boundaries of this project, the VA is the authority having jurisdiction. The SOW references: The end results of the survey/study shall be reflected in the design documents and indicate the current system capacities and the necessary work required for the utilities to adequately support new expansion. In the event the analysis reveals the existing utilities to be inadequate to support the new expansion, A/E team shall be responsible to ensure that adequate utilities are provided for the new expansion. Has the govt performed any due diligence to help characterize the likelihood of off-site utility design Answer: Building 164 is relatively modern, less than 10 years old, so the utility design should mostly consist of connections to the existing utility system. No investigations have been performed on the existing utility system, but record drawings will be supplied. Does the VA have any existing hazardous materials survey documents Answer: The VA has hazardous waste inspection documentation. Can you please further identify/clarify the role and responsibilities for the archaeologist position identified in the pre-solicitation notice (Section 5, Phase I SF 330 Selection Criteria, Item 1, Professional Qualifications) Answer: An archaeologist is not required for this project.

Final Planning

Medical

$14,478,398.00

Public - Federal

Renovation

3

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
128
Bidding Soon
2,296
All Active Projects
1,051
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

img_map_placeholder

5901 E 7th St, Long Beach, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.