BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in West Dover, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The contractor shall do Base and Top/Overlay on the roads listed. All hot mix shall meet State of Vermont DOT latest specifications. There will be no more than 10% recycled asphalt and no asphalt shingles in the mix All shim and overlay will have tack. 1. The contractors shall pave the following roads: Name of Road Length X Width - Depth Dover Hill Road section1 5280 x 24 2" Dover Hill Road section2 3150 x 24 2" Burchard/Abroad Road 1290 x 22 1.5" Crosstown Road 5100 x 22 1.5" Country Club Road 4225 x 22 1.5" Tannery Road 2000 x 22 1.5" Valley View Road 2112 x 22 1" East Dover Road 600 x 22 1" East Dover Firehouse parking lot. 2. Please Include costs of Milling as Dover Hill sections 1-2 will need to be milled to a depth of 2" prior to paving. 3. Town of Dover will supply trucks for milling work. 4. The Road Commissioner will mark all roads before work begins. 5. The contractor will provide Rollers, sweepers, signs and traffic control for paving operations. 6. All shim coats will be at least 1" minimum 7. All driveways will have a 2-foot apron. All intersecting roads must make a smooth transition both off and on roads. 8. The contractor must sweep all shimming and overlay work. 9. The materials used for All overlay will be 3/8 inch asphalt. (For this bid 1/2 " asphalt shim may be used on first 1" Dover hill road. The top coat of 1" will be 3/8" asphalt) 10. The contractor must use two rollers when paving 11. Equipment used by the contractor must be approved by the Road Commissioner and maintained in satisfactory working condition at all times. The Town Point of Contact is Commissioner Travis Briggs. Call (802) 430-3024 for more information or questions. Bidders are expected to meet with Mr. Briggs. Call to arrange meeting times. 14. All work must be completed by September 23rd, 2023. The contractor will be assessed $500.00 per day penalty for each calendar day after that until completed 15. Asphalt Escalator Clause: Due to the volatility of the liquid asphalt market, the winning bidder can apply VAOT formulas to hot mix asphalt items under this contract. The base price per ton will be adjusted according to the posted price on the VAOT website. Note: (base price could increase or decrease with this clause). The vendor must give notice to the town if said clause will affect the bid price per ton. At that point a written agreement with the new price per ton must be in place prior to exercising the escalation clause and the beginning of said project. A copy of the VAOT rates for April 2022 is attached.

Post-Bid

Roads / Highways

$961,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
89
Bidding Soon
1,575
All Active Projects
689
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2023

May 29, 2023

img_map_placeholder

Multiple Locations, West Dover, VT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.