BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2024 at 7:00 PM

Updated February 14, 2024

Site work, new construction, renovation and addition to a mixed-use development in Kirkland, Washington. Completed plans call for the construction of a clubhouse / community center; for the addition of a 11-unit, 44-room multi-residential development; for the renovation of a 164,532-square-foot, 24-unit, 172-room multi-residential development; two-unit, 48-room multi-residential development; and warehouse / distribution facility.

SCOPE OF WORK: Work includes, but is not limited to, the rehabilitation and redevelopment of the Project site which is a single, developed lot in Kirkland, Washington with twenty-five existing wood-framed apartment buildings with 179 residential units, demolition of one existing community/office building, and two existing utility buildings as illustrated on the drawings identified as bidding and/or construction drawings. Building 8 is already rehabilitated and excluded in this contract. The existing wood frame structures will be renovated per the drawings identified as bidding and/or construction drawings, out of which eleven buildings will receive additional floors, three new buildings will be constructed as part of the scope of work including two 24 unit apartment buildings, Buildings 26 and 27, and a new Community Building, Building 28, to be constructed on the site of the current Community and Laundry Buildings as illustrated on the drawings identified as bidding and/or construction drawings. Additional work includes sitework and utility work; site specialties and landscaping work; concrete footings, slabs-on-grade, and cast in place concrete; Type 5-A construction; the balance of building construction including MEP, and fire sprinkler work shown on the drawings and specified herein, and other tasks as described in the bid documents. Questions pertaining to the bid are to be sent via email to nathank@kcha.org no later than seven (7) calendar days prior to bid due date. All responses shall be in the form of Addend Question deadline: 05/12/2023 at 02:00 p.m.

Under Construction

Multi-Residential

$99,069,800.00

Public - City

Addition, New Construction, Renovation, Site Work

1020

51

676

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
115
Bidding Soon
1,815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

July 5, 2023

Project location map

13310 NE 133rd St, Kirkland, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.