Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Renovation of a water / sewer project in Woodstock, Illinois. Completed plans call for the renovation of a water / sewer project.

The Southside Treatment Plant's Npdes Discharge Permit, Which Was Issued in 2021, Requires the City to Reduce the Total Phosphorus Discharged From the Wastewater Plant. The Plant Will Require an Upgrade to Meet This Requirement. A Chemical Feed System and Better Aeration Control Would Need to Be Designed and Potentially an Upgrade to the Plants Solids Handling May Also Be Needed to Meet This New Requirement. Baxter and Woodman Conducted a Phosphorus Optimization Plan in 2021. The Below Requests Are Based on That Plan's Recommendations. Engineering for Phosphorus Reduction Project ($500,000): Provide Design Engineering to Install a Chemical Addition System, Aeration Control System, and Solids Handling System to Reduce Phosphorus Discharged from the Southside Treatment Plant. Project is included in FY25-35, capital improvement plan. As of June 2, 2025, the design of the phosphorus-reduction chemical building and digester improvements were completed. IEPA approval was obtained for this project and bidding of the project went out in October 2024. Constuction began in December 2024 and will take 2 years. FY25/26: Completion of the chemical building and pumping changes to take place this fiscal year. This will include RAS/WAS pumps, chemical tanks, chemical pumps, and digester tank improvements. FY26/27: Completion of digester covers and digester aeration upgrades. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Water / Sewer

$4,982,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
294
Bidding Soon
3,873
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

Project location map

To Be Determined, Woodstock, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.