BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Brodheadsville, Pennsylvania. Completed plans call for the renovation of a educational facility.

Owner reserves the right to reject Bidder if he cannot satisfy all of the Qualification Requirements, including those listed in the Technical Specifications. The Bidder shall perform not less than ten percent (10%) of the actual construction Work with staff employed directly by the Bidder. Project management shall NOT be included in this percentage. An Agreement of Surety certifying that the Surety Company is committed to provide the Bidder with a Performance Bond and Payment Bond each in the amount of one hundred percent (100%) of the contract amount. Alter and extend the existing Building Management System (BMS) for control, monitoring, and alarming of the proposed HVAC equipment and systems as depicted on the drawings and as specified herein. 1. Existing pneumatic controls shall be removed in their entirety with exception to the Middle School boiler room: a. Replace the existing air compressor and air dryer b. Re-connect to existing pneumatic controls serving existing HVAC systems located beyond the bounds of the boiler room. Remove all other obsolete pneumatic controls serving equipment within the boiler room. 2. Portions of the existing building management system may remain in place to serve existing HVAC not replaced under the scope of this project. Where existing HVAC equipment is indicated to be replaced, provide new DDC controls, electronic valve and damper actuation, communication trunk, main network control panels, and all associated wiring, software, programming, graphics, and technical support. a. Prior to commencing demolition and removal of existing HVAC equipment, conduct a site survey with the Mechanical Contractor to identify existing controls which are intended to remain in place upon project completion. Label and mark all devices, wiring, and related components which are intended to remain. Remove all un-used or un-needed components; remove all obsolete components. Do not abandon unused control components or wiring in place. Remove obsolete wiring back to mains or local sources. Cut and terminate wiring that is buried in wall or ceiling construction that is not accessible for complete removal.

Award

Educational

$3,074,000.00

Public - State/Provincial

Renovation

21

25

30

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
203
Bidding Soon
3,516
All Active Projects
1,686
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

July 24, 2023

img_map_placeholder

Multiple Locations, Brodheadsville, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.