Site work and paving for a civil project in Coalton, West Virginia. Completed plans call for site work for a road / highway; for paving for a road / highway; and 19,100-square-foot water / sewer project.

The installation of approximately 19,100 LF of water line, service tubing, new meter settings, gate valves, fire hydrants, tank improvements, various road repair, and other necessary appurtenances. Contract Documents for the project can be examined at the following locations: Civil & Environmental Consultants, Inc. 120 Genesis Boulevard Bridgeport, WV 26330 Contractors Association of West Virginia 2114 Kanawha Boulevard East Charleston, WV 25311 A two-envelope system will be used. Envelope No. 1 must have the following Information presented on the front: Name and address of Bidder, "Bid on Town of Coalton - Contract #1 - Water System Improvements Project", Received by CEC on behalf of the Town of Coalton Envelope No. 2 labeled "Bid Proposal" shall also be placed inside of Envelope #1. Envelope No. 1 will be opened first and the Bid Opening Requirement items checked for compliance as outlined on the Bid Opening Checklist on page BOR - 1 of these contract documents. If such documents are found to be in order, Envelope No. 2 "Bid Proposal", will then be opened and will be publicly read aloud. If the documents required to be contained in Envelope No. 1 are not in order, Envelope No. 2 "Bid Proposal" will not be opened and the Bid will be considered non-responsive and will be returned to the Bidder. A bidder may not withdraw the Bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to the Town of Coalton in an amount equal to five percent (5%) of the base bid. Bidders must comply with the Title VI of the Civil Rights Act of 1964, the Copeland Anti-Kickback Act, and the Contract Works Hours Safety Standards Act. Bidders must comply with the Build America, Buy America (BABA) Act. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21-ID-5. All Bidders are required to have a West Virginia Contractor's License per Section section 21-11-11 of the West Virginia Code. For this project, a Class C "General Engineering" contractor's license is required. Prospective Bidders are advised that the contract awarded under this bid is to be funded in whole or in part by the Town of Coalton and the West Virginia Department of Environmental Protection - Office of Abandoned Mine Lands Economic Revitalization (AMLER) Program. Upon receipt for bids, kindly respond with expression of interest by May 24, 2023 to Matthew Fluharty, Principal, CEC via email at mfluharty@cecinc.com. The Town of Coalton, reserves the right to reject any and all bids. Bids received after the scheduled closing time for the reception of bids will be returned unopened to the bidders.

Bid Results

Water / Sewer

$1,485,750.00

Public - City

Paving, Site Work

25

23

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
22
Bidding Soon
314
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

July 6, 2023

img_map_placeholder

Multiple Locations, Coalton, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.