BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Evergreen Park, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Consists of street pavement patching at various locations throughout the Village All work will be in conformance with the Standard Specifications for Road and Bridge Construction Only qualified Contractors who have demonstrated that they have performed satisfactorily on projects of similar nature will be entitled to receive a Proposal document. Contractors who have not previously demonstrated their ability to perform this type of work with the Engineer shall submit a Statement of Experience consisting of a list of previous projects of similar nature for evaluation by the Engineer in order to receive a Proposal document. The Owner reserves the right to issue a Proposal document only to those Contractors deemed qualified. All Proposals must be accompanied by a Bank Cashier's Check, Bank Draft, Certified Check, or Bid Bond on the form provided in the bid document for not less than five percent (5%) of the total amount of the Bid, or as provided in the applicable sections of the "Standard Specifications". No Bid may be withdrawn after opening of Proposals without the consent of the Owner for a period of forty-five (45) days after the scheduled time of opening of Bids. Tie Contractor will be required to furnish a labor and material "Performance Bond" in the full amount of the Contract. The Contractor will be required to pay Prevailing Wages in accordance with all applicable laws The Owner reserves the right to reject any or all Proposals, to waive technicalities, and to accept the Proposal deemed to be most favorable to the Owner.

Post-Bid

Roads / Highways

$250,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
126
Bidding Soon
1,838
All Active Projects
828
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

June 19, 2023

img_map_placeholder

Multiple Locations, Evergreen Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.