Published June 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Walton, New York. Completed plans call for site work for a water / sewer project.

As of June 12, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Work will generally include but is not limited to: 1. Installation of approximately 1,800 of 8 watermain along Prospect Avenue (NYSDOT Road). 2. Installation of approximately 2,190 of 8 watermain along Bruce Street (Village Road). 3. Installation of approximately 700 of 8 watermain and 300 of 6 watermain along Union Street from the intersection of North Street to the east end of the street (Village Road). 4. Installation of approximately 170 of 6 watermain along Boyer Road (Village Road). 5. Construction of a new 9 x 14 wood well house at the Curry Well Site to serve as pump house for existing water well on site. Existing well case to be sealed and protected against flood. 6. Rehabilitation of the two water tanks: a 500,000 gallon concrete tank and a 830,968 gallon bolted steel tank, located at the end of White Rock Road, one concrete and one bolted steel. BID ALTERNATE work includes but is not limited to: 1. Installation of approximately 1,200 of 8 watermain along Burton Street (Village Road). 2. Installation of approximately 850 of 8 watermain along St. John Street (Village Road). 3. Interior surface rehabilitation of the 500,000 gallon concrete water tank. Checks or money orders for hardcopies shall be made payable to Delaware Engineering, D.P.C. Cash deposits will not be accepted. Any Bidder requiring documents to be shipped shall make arrangements with REV and pay for all packaging and shipping costs. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof. Bidders are advised that Labor and Material and Performance Bonds, each in the amount of 100% of the contract prices, as well as a Certificate of Insurance demonstrating required coverage, shall be provided by the successful bidder(s). In addition, the successful bidder(s) shall provide a one-year maintenance bond in the amount of 100% of the contract price at the completion of work. The Village is financing the project through NYSEFC. Contractors to comply with all regulatory requirements set forth by NYSEFC and as detailed in the NYSEFC Construction Bid Packet included as an exhibit to these specifications. There are requirements for minority and women-owned business (MBE/WBE) participation for each prime contract (26% participation). The Contractors must comply with the Federal wage rates under the Davis Bacon Act Decision Number: NY20220021 Contract Documents, including Advertisement For Bids, Information For Bidders, Labor and Employment, Additional Instructions, Bid Documents, Agreement, General Conditions, General Requirements, Specifications, Contract Drawings and any Addenda, may be examined at no expense on line, or at the office of Delaware Engineering D.P.C., 55 South Main Street, Oneonta NY, 13820 or at the Village Clerk Office, 21 North Street, Walton, NY 13856 The Owner reserves the right to waive any informalities or irregularities in the Bids received, or to reject any or all Bids without explanation, and to select the Bid, the acceptance of which, in its judgment, will best assure the efficient performance of the work.

Bid Results

Water / Sewer

$2,391,937.00

Public - City

Site Work

28

20

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
131
Bidding Soon
1,673
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 31, 2023

img_map_placeholder

Multiple Locations, Walton, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.