BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a playground / park / athletic field in Norton Shores, Michigan. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Please do not submit online questions via VSS. ALL questions should be emailed to Heather DeKorte at dekorteh@michigan.gov address no later than 2:00 p.m., Eastern on Wednesday, June 7, 2023 On behalf of the Michigan Department of Natural Resources (DNR) Parks and Recreation Division (PRD), the Department of Technology, Management, and Budget (DTMB) is requesting professional architectural and engineering services at the P.J. Hoffmaster State Park for the assessment, design, bidding, and construction administration of maintenance upgrades to the Gillette Visitor Center, replacement the Large Day-Use Beach House with new toilet building, and conversion of the Small Day-Use Beach House toilet/changing building into an open-air picnic pavilion. This request is to provide Phase 300 Schematic Design, Phase 400 Design Development, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection Services. In addition, the Gillette Visitor Center will require a Phase 100 Study.

Award

Playgrounds / Parks / Athletic Fields

$1,055,500.00

Public - State/Provincial

New Construction, Site Work

115

12

2

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
78
Bidding Soon
869
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

August 14, 2023

Project location map

6585 Lake Harbor Rd, Norton Shores, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.