Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Guernsey, Wyoming. Completed plans call for the construction of a 42,934-square-foot fire / police facility; for site work for a road / highway; for paving for a fire / police facility; sidewalk / parking lot; fire / police facility; and water / sewer project.
The project consists of the design and construction of approximately 29,488 SQFT Fire Station, 7,446 SQFT Air Traffic Control Tower, and a 6,000 SQFT Airfield Operations Building. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas, and site improvements. The project consists of the design and construction of approximately 29,488 SQFT Fire Station, 7,446 SQFT Air Traffic Control Tower, and a 6,000 SQFT Airfield Operations Building. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas, and site improvements. RFQ questions shall be submitted on the Public Purchase website by 1:00 p.m. Mountain Time on June 30, 2023. All questions will be answered and provided to all prospective bidders via answers on the Public Purchase website or in the form of a written addendum posted on Public Purchase, on or before July 6, 2023. Questions received after 1:00 p.m. Mountain Time on June 30, 2023, will not be addressed. The project will be constructed on State land and will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per Public Law 90-480. Facilities will be designed to a minimum life of 50 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02), including energy efficiencies, building envelope and integrated building systems performance as per ASA (IE&E) Sustainable Design and Development Policy Updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoD Minimum Antiterrorism for building standards will be provided. This complex will be designed and constructed to meet the requirements of a National Guard Fire Station in compliance with UFC 4-730-10 c1 Fire Stations, Airfield Operations building and Aircraft Control Tower in compliance with UFC 3-260-01 and UFC 4-133-01 c2. This project has been coordinated with the installation antiterrorism plan. Risk and threat analyses have been performed in accordance with DA Pam 190-51 and TM 5-853-1, respectively. Protective measures required by regulation and the minimum standards as required by UFC 4-010-01 (Department of Defense Minimum Antiterrorism Standards for Buildings) are needed. The new complex will be constructed for the Wyoming Army National Guard (WYARNG). This project will serve full-time, traditional guardsmen, and civilian personnel. The project will be capable of supporting all manner of training and operations for all State and Federal missions.
Post-Bid
Fire / Police
$18,094,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2023
September 11, 2023
101 N Dakota Ave, Guernsey, WY
Related To This Project
Guernsey, WY
Bid Date: Nov 12 2020
Guernsey, WY
Bid Date: Feb 10 2022
Guernsey, WY
Bid Date: Feb 14 2024
Guernsey, WY
Bid Date: Apr 11 2024
Guernsey, WY
Bid Date: May 08 2024
Guernsey, WY
--
Guernsey, WY
Bid Date: Feb 15 2023
Guernsey, WY
Bid Date: Apr 29 2021
Guernsey, WY
Bid Date: Aug 01 2019
Guernsey, WY
Bid Date: Aug 09 2019
Guernsey, WY
Bid Date: Jun 23 2020
Guernsey, WY
Bid Date: Jun 03 2020
Guernsey, WY
Bid Date: May 28 2020
Guernsey, WY
Bid Date: Jun 02 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.