EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 10, 2023 at 8:00 PM

Updated October 1, 2024

Asbestos abatement and renovation of a military facility in Randolph Air Force Base, Texas. Completed plans call for the renovation of a military facility; and for asbestos abatement for a military facility.

The 12th Maintenance Group, Joint Base San Antonio-Randolph, TX requires the Removal of a Spacesaver filing system, to include asbestos and lead based paint remediation, in room 601 of hangar 13. Refer to the attachments for further information. Despite a construction NAICS being selected, this acquisition is NOT for construction, and the Service Contract Labor Statutes apply, as determined by the Department of Labor. Any construction related references found in the Statement of Work shall be disregarded. Note: Due to the size of this project, portions of the attached SOW may not be applicable but should be considered. Specifically, tasks related to the abatement and/or removal of all hazardous materials must be compliant with all applicable federal, state, and local requirements, and the individual(s) performing those services must be appropriately trained and certified. A single optional site visit will be held at Hangar 13, 10496 5th Street East JBSA-Randolph, TX 78150 on Jul 13, 2023, at 9:30 AM CDT. It is highly encouraged that contractors allow ample time to access the JBSA-Randolph, TX Visitor Control Center as delays will likely be encountered. All desired attendees must provide the following information to both RFQ POCs no later than 2:00 PM CDT, Jul 11, 2023: Visitor's name Date of birth Country of birth Identification type and State or Country of Issue.

Post-Bid

Military

$100,000.00

Public - Federal

Asbestos Abatement, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
48
Bidding Soon
2,037
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

img_map_placeholder

To Be Determined, Randolph Air Force Base, TX

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Remove Filing System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.