BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Davenport, Iowa. Completed plans call for site work for a road / highway.

Project involves repairing or replacing guardrail at two locations. On N Pine Street, replace posts, blocks, and rail as needed to repair damage from vehicle crash. Two sections of rail are damaged. At the intersection of W 10th Street and Fillmore Street, replace approximately 31 feet of rail, reset or replace posts, and replace two Type 3 object markers. Desire completion date for all work is October 31, 2023. Quotes should be submitted separately per location. Include delivery time and how long the quote is valid for. Any vendor doing business with the City of Davenport is required to have a valid Purchase Order issued by the City of Davenport to commence work or supply products to the City. The City of Davenport reserves the right to award to multiple vendors. 7/13/2023 02:00:00 PM (CT): Questions Due : Questions are due to the Purchasing Division no later than the time indicated. Submit your questions via to questions tab. 7/14/2023 02:00:00 PM (CT) Answers Posted :Answers to inquiries that were submitted will be issued no later than the date indicated.

Award

Roads / Highways

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
179
Bidding Soon
1,172
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

August 21, 2023

Project location map

Multiple Locations, Davenport, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.