BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in McKenzie Bridge, Oregon. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project consists of constructing a 58 feet (out-to-out) prefabricated steel beam pedestrian trail bridge on reinforced concrete grade beams with a gabion basket foundation. Work includes but is not limited to: construction survey and staking, clearing and grubbing, soil erosion and pollution control, structural excavation, placing aggregate base rock, assembling gabion foundations, installation of a precast or cast-in-place concrete grade beam, design/fabrication/transport/construction/placement of a prefabricated steel beam superstructure, installation of a wood deck and railing, waste removal, and mulching. PROJECT LOCATION This project is located on the McKenzie River Ranger District on the Willamette National Forest, Township 15 South, Range 7 East, Section 6, near McKenzie Bridge, OR. Project location: [Lat. 44.295530N, Long. -122.029820W] MAGNITUDE OF CONSTRUCTION PROJECT The Government's estimate is between: $0 and $200,000

Final Planning

Bridges / Tunnels

$200,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
10
Bidding Soon
200
All Active Projects
83
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

img_map_placeholder

To Be Determined, McKenzie Bridge, OR

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.