BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Ridgefield, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of September 3, 2024, an engineer hasn't been selected yet. Construction is expected to take place in the spring and summer of 2025. Work includes pre-design study, design, environmental documentation and bid documents for signing, pavement markings and street lighting at the intersection of S. 11th Street and S Timm Road. The contract may be supplemented for subsequent phases including right-of-way acquisition and construction support. The 2022 Ridgefield City Safety Plan (LRSP; DKS for Regional Transportation Council, 2022) evaluated collision data at the S. 11th Street and S Timm Road intersection and identified Safety Needs. The intersection is located in an industrial area of Ridgefield, S 11th Street and S Timm Road has unsignalized traffic control. S 11th Street is a narrow road with trucks frequently entering the intersection. The crosswalk at this intersection is long and lacks illumination. The 2022 LRSP scoped the S 11th Street Eastbound Approach at S Timm Rd Intersection Safety Project to address the identified needs at this intersection. The consultant will evaluate the proposed countermeasures and determine if they are sufficient or suggest alternatives to address the safety needs at the intersection. The design phase (Tasks 1-3) will consist of the following: -Review the collision data, the 2022 LRSP and the 2024 update and confirm or modify the countermeasures to be designed and implemented. -Prepare a conceptual design and area of potential effect (APE). -Write the NEPA including working through the approval process -Prepare a preliminary and final design for review. -Finalize design and bid documents. The anticipated work schedule is as follows: -Task 1 (Project management and coordination) is to be initiated immediately upon Notice to Proceed (NTP) and will last for the duration of the project. -Task 2 (design and bid support) is to be completed within 4 months of NTP. The design task will include community outreach that will be led by City staff. -Task 3 (environmental documentation and permitting) is to be completed within 6 months of NTP. This contract may be supplemented for the following future tasks: -Task 4 (right-of-way acquisition) is to be initiated per schedule determined during Task 2 and Task 3 work but must be initiated no later than 5 months after NTP. -Task 5 (construction management) is to be initiated within one month of approval of design and environmental documents (if necessary) and securing right-of-way. Duration of task to be determined. Design tasks are expected to be completed by the end of 2024. Project construction is expected to be completed by May 1, 2025. The design phase will be funded by a 2022 City Safety Selections grant funded through FHWA and must meet FHWA requirements for design and approval. Contract Plans, Specifications and Estimates (PS&E) shall be prepared in accordance with the current State of Washington Standard Specifications for Road, Bridge and Municipal Construction, amendments thereto, and adopted design standards per the Local Agency Guidelines (LAG) chapter 44. The WSDOT Local Program Engineer will review the PS&E to ensure compliance with the LAG Manual and contracting will be done via the WSDOT Local Agency Guidelines manual. All prospective consultants must be advised that federally funded projects will be held to Federal EEO requirements. This project has a 0% DBE goal. Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: 1. Team and Project Manager Qualifications 2. Experience with Safety Improvements Studies and Design All project or contract language specific questions, requests for substitutions or changes, or requests for clarification must be submitted via Online by 4:00 p.m. on Monday, July 8, 2024. Estimated Notice to Proceed: Monday, August 12, 2024 The City reserves the right to cancel this request or reject any and all Submittals or to waive any minor formalities of this call if the best interest of the City would be served.

Conceptual

Roads / Highways

$29,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
32
Bidding Soon
480
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

S Timm Rd & S 11th St, Ridgefield, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.