BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Firestone, Colorado. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline 08/30/2023 at 12:00 PM MT The Town of Firestone wants to conduct a bridge replacement of the structure located at Weld County Road 20 (WCR 20) and Coal Ridge Ditch in Firestone, Colorado. The scope of work for this project includes the steps to achieve the design of the bridge replacement project as a result of the collaboration between the Consultant, the Town of Firestone, and the Colorado Department of Transportation Region 4 (CDOT). The WCR 20 Bridge Replacement shall be prepared to a level that is acceptable for Local Agency submittal to CDOT for the federally funded construction phase. All will be performed under the direct supervision of and sealed by a Licensed Professional Engineer in the State of Colorado. The Town is planning on applying for an Off-System Bridge grant in the fall of 2023. The town is requesting all the consultants to provide scope and fee considering both the option of with and without consideration of a federally funded project. See Exhibits A1 and A2 for the complete Scope of Work and associate deliverables.

Conceptual

Bridges / Tunnels

$1,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
64
Bidding Soon
1,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2024

Project location map

To Be Determined, Firestone, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.