BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Barco, North Carolina. Completed plans call for site work for a educational facility.

**As of September 25, 2023, this project has not yet been awarded. A timeline for the award has not yet been established.** Questions and/or requests for clarification shall be submitted in writing to Crystal Owens, Contract Purchasing Agent email to bids@CurrituckCountyNC.gov no later than 10:00 a.m.. on Wednesday, August 23, 2023. All questions requiring additional information will be responded to in an addendum no later than 10:00 a.m. on August 30, 2023. All addenda shall become part of the Contract Documents The intent of this Request for Bid (RFB) is to seek and obtain proposals to repair and resurface six (6) exterior tennis courts, measuring approximately 302' x 121.5' in overall dimension, located at Currituck County High School, 4203 Caratoke Highway, Barco, North Carolina. Repairs, resurfacing, playing lines, etc. must meet United States Tennis Association (USTA) specifications. Background: o In 2012, the old courts were demolished and replaced with the current tennis facility in 2013. o In 2019, the courts were resurfaced. Description of Facility: o 6 regulation courts (Approximately 302' x 121.5' in overall dimension). o Each court has regulation lines as well as 10U blended lines. o Courts have "US Open" color scheme. o Courts are surrounded by chain-link fencing with four entry gates. Repairs and Resurfacing of tennis courts must include the following: o Surface preparation must include cleaning and scraping all courts of loose material, dirt, and debris. o Fill all structural cracks using USTA standard repair methods. o Patching any depressions holding more than 1/8" of water after being allowed to drain for one hour using an acrylic patch material. o Repair and patch any structural cracks, dings, etc., in the asphalt surface using an acrylic patching material. o Resurface using the same color scheme as the current Courts. o Use regulation lines and the 10U blended lines on each of the 6 courts. o Clean net posts of all rust, then spray paint using rust preventative paint; install new nets and straps and hang to correct height and tension. Clean job site and dispose of all debris. Schedule/Timeline Restrictions: o CCHS Fall Tennis will be using the courts from August 2023 to October 28, 2023; no work can be done in that time frame. o CCHS Spring Tennis will be using the courts if possible.

Bid Results

Educational

$62,450.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
23
Bidding Soon
381
All Active Projects
137
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

October 6, 2023

img_map_placeholder

4203 Caratoke Hwy, Barco, NC

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.