BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fontana, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of March 11, 2024, the project has not been awarded. A timeline for award has not been confirmed. The City of Fontana is the lead Agency for the San Sevaine Trail Project that will construct a 1.25-mile Class I Multi-User (Bicycle and Pedestrian) path, hereby referred to as San Sevaine Trail (SST). The SST runs parallel and along the westerly side of the East Etiwanda Creek/San Sevaine Channel. The project will be constructed within San Bernardino County Flood Control District (SBCFCD) and Caltrans Right of Way, in the City of Fontana and City of Rancho Cucamonga. The project will utilize portions of the existing SBCFCD maintenance roads along the channel, which will be striped and signed for an approximate 12-foot-wide, asphalt concrete paved multi use path. In areas of non-accessible access pathways along. the SBCFCD maintenance roads, the project will construct new paths parallel to the existing roadways to provide an accessible pedestrian pathway. The trail construction will create a pedestrian connection link to Victoria Street. This connection will include a new pedestrian traffic signal for crossing Victoria Street, and street improvements to Victoria Street undercrossing I-15 Freeway that include new curb, gutter, sidewalk and drainage inlets and connector piping. To provide for the continuous multi-user path along the East Etiwanda/San Sevaine Channel, the project will require new construction improvements under the Caltrans owned I-15 Freeway (BR 54-0964) and SR-210 Freeway (BR 54-0681 and BR 54-1312, spanning the East Etiwanda Creek/San Sevaine Channel. The new trail improvements within the Caltrans owned Right-Of-Way (Caltrans ROW) include the construction of ground anchor walls, and concrete retaining walls to permit the new trail construction and maintain support of the existing bridge foundations. The trail construction will include an approximate 12-foot-wide asphalt concrete trail, fencing, railings and trail lighting improvements. This is a federally funded project, and all bidders will be required to meet all federal requirements to be eligible to bid on this project. Bidders are advised that, as required by federal law, the State has established a statewide overall DBE goal. This City Contract is considered to be a part of the statewide overall DBE goal. The City is required to report to Caltrans on DBE participation for all federal- aid contracts each year so that attainment efforts may be evaluated. In addition, there is a Contract-Specific DBE participation goal for this project. Question Deadline 09/28/2023 Bid Valid 90 Days Liquidated Damages $6,700 Per Calendar Days Estimated Bid Value $9,187,200 Start/Delivery Date October 2023 Project Duration 140 Working Days

Bid Results

Roads / Highways

$13,314,324.00

Public - City

Paving, Site Work

222

14

38

7

Subscribe For Documents

112 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
245
Bidding Soon
3,673
All Active Projects
1,585
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 9, 2023

December 1, 2023

May 19, 2024

img_map_placeholder

Multiple Locations, Fontana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.