BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Dallas, North Carolina. Completed plans call for the renovation of a water / sewer project.

Bidders must be a licensed contractor in the State of North Carolina. Subject to the provisions of the State of North Carolina Contractor's Licensing Law, it will be necessary for the contractor to place his contractor's license number on the envelope containing his bid. No bid shall be considered or accepted by the City of Gastonia unless at the time of its filing the same shall be accompanied by the Contractors Pre-Qualification Form (in Form section of bid documents). In lieu of making the cash deposit, bidder may file a bid bond executed by a corporate surety licensed under the laws of North Carolina to execute such bonds, conditioned that the surety will, upon demand forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. This deposit shall be retained if the successful bidder fails to execute the contract within ten (10) days after the award or fails to give satisfactory surety as required herein. The successful bidder shall be required to enter into a contract with the City of Gastonia in writing and shall be required to furnish bond from some surety company authorized to do business in the State of North Carolina, make deposit of money, certified check, or government sureties for the full amount of said contract for the faithful performance of the terms of said contract as required by Section 143-129 of the General Statutes of North Carolina. No bid shall be withdrawn after the opening of bids without the consent of the City of Gastonia, for a period of sixty (60) days after the scheduled time of closing bids. The Bid securities of all bidders, except those submitted with the three (3) lowest acceptable proposals, will be returned within fifteen (15) days after the time of opening the bids. The bid security accompanying the three lowest acceptable proposals may be held by the City of Gastonia, North Carolina, until a construction contract has been executed and a satisfactory Performance Bond in the sum of the full amount of the contract has been delivered to the City of Gastonia. Each bid should be accompanied by a letter from the bidder's insurance representative certifying that said insurer has read the insurance requirements as set forth in the General Conditions of the contract and will issue the required policies if awarded a contract. The award of any contract will be made by the City of Gastonia, North Carolina, to the lowest responsive, responsible bidder. Responsible bidder will be defined as one who furnishes satisfactory evidence that he has the requisite experience and ability and that he has sufficient capital, facilities, and plant to enable him to perform the work successfully and promptly, and to complete the work within the time specified in the contract documents. At a minimum, responsible bidder shall be appropriately licensed by the State of North Carolina, have provided the required bid bond, have the capability of meeting bonding and insurance requirements, and be in compliance with Federal, State, and local laws and regulations applicable to the project. The City of Gastonia reserves the right to reject any proposal for failure to comply with all requirements of this notice or of any of the contract documents; however, it may waive any minor defects or informalities at its discretion. The City of Gastonia further reserves the right to reject all proposals or award a contract which, in its judgment, is in the best interest of the City. Any print order placed on this site includes all plans and specifications, including any addenda released at the time of order. Downloads do not include addenda, they are all available on the "Addenda" tab of this page. Planholders will be notified by email when future addenda are issued. It is the responsibility of each plan holder to download the addenda. Shipping, if required, will be charged to each order. Online orders are filled within 1-2 business days after payment is secured.

Award

Water / Sewer

$823,757.00

Public - City

Renovation

10

16

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
124
Bidding Soon
1,781
All Active Projects
744
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 24, 2023

November 23, 2023

November 22, 2024

img_map_placeholder

3000 Old Spencer Mountain Rd, Dallas, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.