Site work and paving for a road / highway in Stratford, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This project involves the reconstruction and resurfacing of Central Avenue and Kirkwood Avenue within the Borough of Stratford. BASE BID - KIRKWOOD AVENUE FROM STA 10+52.93 TO STA 13+79.72 CENTRAL AVENUE FROM STA 10+60 14+76.25 Kirkwood Avenue will be reconstructed by means of scarification. Central Avenue will also be resurfaced by means of a profile mill and overlay. Kirkwood Avenue will be reconstructed by means of scarification of the existing roadway as indicated on project plans. The expanse of the roadway will be scarified utilizing a six inch (6") pulverized soil aggregate base course, road mixed, and will receive a two-and-a-half inch (2.5") hot mix asphalt 19M64 base course. Areas of the roadway exhibiting signs of failure will require hot mix asphalt pavement repair which will be field located by the Engineer. The roadway will then receive a one-and-a-half inch (1.5") hot mix asphalt 9.5M64 surface course overlay. Central Avenue and Kirkwood Avenue will be resurfaced by means of mill and overlay of the existing roadway as indicated on project plans. The roadway will be milled to a depth of two inches (2") deep. Areas of the roadway exhibiting signs of failure will require hot mix asphalt pavement repair which will be field located by the Engineer. The roadway will then receive a two inch (2") hot mix 9.5M64 surface course overlay. Hot mix asphalt keyways will be installed where required in order to tie into existing edge of pavement and grade. In addition to the reconstruction and resurfacing of the existing roadways, there will be partial replacement of driveway aprons, curb, and sidewalk. ADA accessible handicap ramps will be installed in accordance with NJDOT specifications at several locations. Traffic striping and symbols will be installed as indicated on project plans. Topsoil, fertilizer and seed will be placed at all disturbed areas. ADD ALTERNATE BID #1 - CENTRAL AVENUE FROM STA 14+76.25 TO STA 18+28.74 Add Alternate Bid #1 will continue the mill and overlay of Central Avenue in similar fashion to the Base Bid. ADD ALTERNATE BID #2 - CENTRAL AVENUE FROM STA 18+28.74 TO STA 21+74.22 Add Alternate Bid #2 will continue the mill and overlay of Central Avenue in similar fashion to the Base Bid and Add Alternate Bid #1. sealed bids will be received by the Borough of Stratford for the FY 2022 NJDOT Trust Fund Resurfacing of Central Avenue & Kirkwood Avenue Phase II project in the Borough of Stratford, Camden County, New Jersey. Each bid shall be accompanied by a certified check, cashier's check or bid bond duly executed by the bidder as principal and having as surety thereon a surety company approved by the Borough of Stratford in an amount not less than ten percent (10%) but in no case in excess of $20,000.00 of the amount bid. Any such bid bond shall be without endorsement or conditions. Bid shall also be accompanied by a certificate letter from a surety company stating that it will provide the bidder with the completion bond. Bids must be on the bid form prepared by Bach Associates, PC, in the manner designated therein and required by the specifications, must be enclosed in sealed envelopes bearing the name and address of the bidder on the outside and also bearing on the outside reference to the particular work bid upon. Said bids shall be addressed to Mr. Bill Bray, Borough Clerk, Borough of Stratford, 307 Union Avenue, Stratford, New Jersey 08084.
Post-Bid
Roads / Highways
$3,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2023
November 21, 2023
Multiple Locations, Stratford, NJ
Related To This Project
Stratford, NJ
Bid Date: Jan 29 2021
Stratford, NJ
Bid Date: Mar 12 2024
Stratford, NJ
Bid Date: May 21 2024
Stratford, NJ
Bid Date: Aug 08 2024
Stratford, NJ
Bid Date: Sep 19 2023
Stratford, NJ
Bid Date: Sep 07 2023
Stratford, NJ
--
Stratford, NJ
Bid Date: Apr 28 2023
Stratford, NJ
Bid Date: Apr 10 2023
Stratford, NJ
Bid Date: Jun 30 2022
Stratford, NJ
Bid Date: Jul 06 2022
Stratford, NJ
--
Stratford, NJ
Bid Date: Dec 22 2022
Stratford, NJ
Bid Date: Oct 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.