BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated December 20, 2025

Renovation of an educational facility in Stratford, New Jersey. Completed plans call for the renovation of a educational facility.

Contract Award Pending Board Meeting on 04/28/25 For Samuel S. Yellin School 2025 Partial Roof Replacement. 2. ROOF TYPE I: The work consists of removal of the existing 3-Ply modified bitumen roof membrane system and nailer base sheet at the areas indicated, down to the top surface of the light weight concrete topping (LWCT). All portions of the existing LWCT assembly are to remain and be prepared to receive the new rigid insulation and SBS roof membrane system. Remove all metal edge work, gutters, soffit assemblies, scupper boxes, downspouts, flashing, etc. as shown on the Construction Documents. The new roof system will consist of new uniform thickness insulation (See Roof Types on the drawings) with all joints staggered, 1/2" coverboard and a 2-ply mineral surface modified bitumen roof system. Provide new wood blocking to accommodate increased height of the new roof assembly. Provide new tapered insulation (crickets) to divert water around all roof penetrations/obstructions (not all crickets are shown on the drawings for clarity purposes) as required for positive drainage throughout the roof areas. 3. ROOF TYPES II, III & IV: The work consists of complete removal of the entire roof membrane system at the areas indicated, down to the structural deck (Wood, Concrete and Metal) including removal of all metal edge work, gutters, soffit assemblies, scupper boxes, downspouts, flashing, etc. as shown on the Construction Documents. The new roof system will consist of new uniform thickness insulation and tapered insulation (See Roof Types on the drawings) with all joints staggered, 1/2" coverboard and a 2-ply mineral surface modified bitumen roof system. Provide new wood blocking to accommodate increased height of the new roof assembly. Provide additional new tapered insulation (crickets) to direct water into building drainage elements and also to divert water around all roof penetrations/obstructions (not all crickets are shown on the drawings for clarity purposes) as required for positive drainage throughout the roof areas. Bidders Prime Subcontractors, defined as those listed in N.J.S.A. 18A:18A-18, must be pre-qualified by DPMC with the DPMC classification associated with the work they intend to directly perform or subcontract. The Bidder and named Prime Subcontractors must be pre-qualified prior to the date that bids are received. Bids must be accompanied by a certified check, bank cashiers check, treasurers check or Bid Bond in the form provided in the Contract Documents, with corporate surety satisfactory to the Owner, in an amount of 10% of the Base Bid, but in no case in excess of $20,000.00, The on-site Construction period, during which all work on site is to be performed, is to start on or about June 20, 2025. All work must be substantially complete by August 22, 2025. Deadline for Questions at 5:00 P.M. (email jminniti@garrisonarch.com) Monday 03/24/25 Deadline for Addendum Sent to Bidders,

Award

Educational

$3,360,225.00

Public - City

Renovation

17

12

2

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
27
Bidding Soon
3,651
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 20, 2025

Project location map

111 Warwick Rd, Stratford, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.