Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Stratford, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Bids must be on the bid form prepared by Bach Associates, PC, in the manner designated therein and required by the specifications, must be enclosed in sealed envelopes bearing the name and address of the bidder on the outside and also bearing on the outside reference to the particular work bid upon. Said bids shall be addressed to Mr. John D. Keenan, Jr., Borough Administrator, Borough of Stratford, 307 Union Avenue, Stratford, New Jersey 08084. The Borough of Stratford reserves the right to consider the bids for sixty (60) days after the receipt thereof, and further reserves the right to reject any or all bids, either in whole or in part and also to waive any informality in any and make such awards or take action as may be in the best interest of the Borough of Stratford. The right is reserved to reject any or all proposals, in whole or in part, or to make awards to such bidder or bidders who, in the judgment of the Borough of Stratford, is the lowest responsible bidder and to waive such informalities as may be permitted by law. Additional information on this requirement is available from ELEC at 888-313-3532 or online. MBE (19%), WBE (6.9%) Substantial Completion: Sixty (60) Calendar Days Final Completion: Seventy Five (75) Calendar Days Scope- This project involves the resurfacing of Central Avenue within the Borough of Stratford. BASE BID - STA 21+74.22 TO STA 29+95.23 Central Avenue will be resurfaced by means of mill and overlay. The roadway will be milled to a depth of two inches (2") deep. Areas of the roadway exhibiting signs of failure will require hot mix asphalt pavement repair which will be field located by the Engineer. A section of the roadway designated on the plans will be excavatedto a depth of twelve inches (10") and reconstructed with six inches (6") of dense graded aggregate and four inches (4") of hot mix asphalt 19M64 base course. The entire roadway will then receive a two inch (2") thick layer of hot mix asphalt 9.5M64 surface course. In addition to the reconstructing of the existing roadway, there will be full replacement of driveway aprons. Concrete curb will be constructed along portions of Central Avenue as indicated on the plans. ADA accessible handicap ramps will be installed in accordance with NJDOT specifications. Traffic symbols and signage will be installed as indicated on project plans. Topsoil, fertilizer and seed will be placed at all disturbed areas. ADD ALTERNATE BID #1 - STA 18+26.39 TO STA 21+25.82 Add Alternate Bid #1 will consist of face forming curb along Central Avenue as indicated on the plans. The Contractor shall be responsible to remove excess unwanted materials from the project site and dispose of all excess unwanted materials in an approved manner. Should the Borough of Stratford want any excess material, the material shall be delivered to the Borough's site at no additional charge. Vehicular and pedestrian traffic is to be maintained over the roadway within the scope of the project at all times. All Construction Items will be funded by the FY 2023 NJDOT Municipal Aid Program.
Award
Roads / Highways
$222,059.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2024
September 30, 2024
Central Ave, Stratford, NJ
Related To This Project
Stratford, NJ
Bid Date: May 21 2024
Stratford, NJ
Bid Date: Mar 12 2024
Stratford, NJ
Bid Date: Jan 29 2021
Stratford, NJ
Bid Date: Sep 22 2023
Stratford, NJ
Bid Date: Sep 19 2023
Stratford, NJ
Bid Date: Sep 07 2023
Stratford, NJ
--
Stratford, NJ
Bid Date: Apr 28 2023
Stratford, NJ
Bid Date: Apr 10 2023
Stratford, NJ
Bid Date: Jun 30 2022
Stratford, NJ
Bid Date: Jul 06 2022
Stratford, NJ
--
Stratford, NJ
Bid Date: Dec 22 2022
Stratford, NJ
Bid Date: Oct 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.