BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chavies, Kentucky. Completed plans call for site work for a water / sewer project.

This project is located in Perry County near the community of Chavies KY, to reach the sites from the Intersection of KY Hwy 15 and KY Hwy 28, take KY Hwy 28 travel West 5.82 miles to the intersection of First Street, turn right onto First Street, travel 0.37 miles to Winfred Smith Site. DRIVING DIRECTIONS TO OTHER SITES: from intersection of KY Hwy 28 and First Street turn right onto First Street, travel 0.07 miles to Hill Street turn left onto Hill Street. Travel 0.03 miles to Deaton Loop Road turn right onto Deaton Loop and travel 0.19 miles to Michael Smith site, continue on Deaton Loop 0.06 miles to Haven King site on right of road. The Winfred Smith Site will consist of a 45' Long 4' high Concrete Gravity Wall, which will divert water from large drain behind house, 275' of ECB "V" Ditch will be constructed to create positive drainage around residence. The placement of a 24" HDPE pipe in place of damaged existing CMP pipe will be done. The Haven King Site with consist of the regrading and revegetation of 2 small slide areas just South of residence, regrade and replacement of 240 LF of Class II ditch. The placement of a 24" HDPE pipe with 1-ELL headwall on inlet end of pipe to replace damaged existing CMP pipe will be done. The Michael Smith Site will consist of the replacement of 2-CMP pipes with a 24" HDPE pipe with Sloped and Flared headwalls on each end of pipe to replace damaged existing CMP pipe. The construction of a 24" Sloped and flared headwall on an existing 24" HDPE pipe to promote positive drainage. The placement of an additional 24" HDPE pipe with Sloped and Flared headwalls on each end of pipe in place of damaged existing CMP pipe will be done. The Red Hill Baptist Church site will consist of the regrading and revegetation of 1 0.5 acre slide areas and 1 small slide just North of Church, regrade and replacement of 160 LF of Class II ditch. Bidder assumes full responsibility for timely delivery of the bid in compliance with the above described procedures and conditions.

Bid Results

Water / Sewer

$185,950.00

Public - State/Provincial

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
44
Bidding Soon
463
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.