BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2024 at 7:00 PM

Updated January 27, 2024

Renovation of a mixed-use development in Brattleboro, Vermont. Completed plans call for the renovation of a educational facility.

The Windham Southeast School District (WSESU) is seeking interested Mechanical Contractors to prequalify for a installation of a heat pump based heating and ventilating system at Oak Grove School, 15 Moreland Ave. Brattleboro, VT. The scope of improvements for this contract includes Mechanical and Controls throughout the building. The school district will be executing a single contract with the contractor for all the work Prequalification criteria is available by contacting Mr. Hebb. Eligibility will be shared 11/14/23 with bids due 12/18/23

Post-Bid

Educational

$200,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
263
Bidding Soon
3,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2023

January 18, 2024

Project location map

15 Moreland Ave, Brattleboro, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.