Site work and renovation of a civil project in Chester, Montana. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Chester Wastewater Improvements - 2023 The proposed work includes two schedules. Schedule I includes improvements to the Chester wastewater collection and treatment system, with improvements at the existing lagoons site and installation of several new manholes in various locations around town. Collection system improvement include replacing approximately 390-feet of gravity sewer in the alley south of Casey St between 1st Street E and 2nd Street E., and installation of seven (7) new manholes on stub ends of existing sewer mains. Treatment system improvements include sludge removal from Cell 1 of the existing wastewater lagoon cells, removal of existing and installation of a new flow structure and influent flow splitter structure, removal of the Cell 1 outlet, Cell 1 alternate outlet, Cell 2 outlet, and Cell 3 inlet, and replacing existing 10" gate valves with 5 new 10" plug valves and fittings. At the existing lagoon site lift station, installation of new lift station flowmeter, removal and replacement of existing rock basket, and lining of the existing wet well. The multi-level outlet structure at the effluent of Cell 3 is to be lined and the existing depth gauge in the outfall flume is to be removed and replaced. Schedule II includes a Base Bid of CIPP lining of an approximate 1,750 LF of 10" diameter clay pipe as well as three additive alternates. Additive Alternate #1 includes CIPP lining of approximately 1,540 LF of 8" diameter pipe including 910 LF of concrete pipe and 630 LF of clay pipe. Additive Alternate #2 includes CIPP lining of approximately 480 LF 8" diameter clay pipe, and Additive Alternate #3 includes CIPP lining of approximately 860 LF of 8" diameter clay pipe. Bid results :: SCHEDULE I :: Lakeside Excavation, Inc :: $1,350,935.00 SCHEDULE II :: Planned & Engineered Construction Inc (PEC) :: $155,711.00
Award
Water / Sewer
$1,436,984.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 15, 2023
January 18, 2024
Multiple Locations, Chester, MT
Related To This Project
Chester, MT
Bid Date: Apr 22 2024
Chester, MT
Bid Date: Sep 05 2024
Chester, MT
Bid Date: Aug 12 2024
Chester, MT
Bid Date: Mar 03 2022
Chester, MT
Bid Date: Feb 04 2022
Chester, MT
Bid Date: Aug 10 2023
Chester, MT
Bid Date: Mar 21 2024
Chester, MT
--
Chester, MT
Bid Date: May 10 2022
Libby, MT
Bid Date: Nov 16 2023
Helena, MT
Bid Date: Nov 14 2023
Billings, MT
Bid Date: Nov 21 2023
Helena, MT
Bid Date: Nov 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.